The Ultimate BIM Knowledge Hub

Your one-stop resource for BIM electrical.
0 Total Posts

Residual Current Device (RCD)

AResidual Current Device (RCD) is amechanical switching device or association of devices intended to cause the opening of the contacts when the residual current* attains a given value under specified

Read More »
Dictionary
Jarek Wityk

volume

ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained a term defined by BS 1192:2007 means a spatial subdivision of a project to allow multiple people to work on Project Information

Read More »

quantity

property of a phenomenon, body, or substance, where the property has a magnitude that can be expressed by means of a number and a reference. for example a measure with

Read More »

Cyber-Physical Systems

Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a Cyber-Physical System is a Digital

Read More »
How To
Jarek Wityk

Force Relinquish

Tip of the Day (TOD): How to Relinquish Locked Revit Models If you’ve ever been frustrated by locked Revit model elements when a team member is unavailable to relinquish them,

Read More »

interoperability

the ability of two or more systems* to exchange information and to use the information that has been exchanged. definition adapted from the one contained in ‘ISO/TS 27790:2009, Health informatics—

Read More »

data template

schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with the term “data template”. E.g.

Read More »
Classification and Standardisation
Jarek Wityk

Complete information

adjective In Architecture Engineering and Construction (AEC), complete information is information which includes all the necessary and typical parts or elements, lacking nothing. For the information to be deemed complete,

Read More »
Instructions
Jarek Wityk

Project Template_RVT_2024

Revit Electrical Project Template 2024 v24.1.1 Template For: Electrical Engineers, Bim Managers, Electrical Designers Setup: Typically 2–4 hours — quicker for experienced users. View Details Technical Details Released: Jul 24,

Read More »

information

reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]

Read More »

Competent person

Aperson who possesses sufficient technical knowledge, relevant practical skills and experience for the nature of the electrical work undertaken and is able at all times to prevent danger and,where appropriate,

Read More »

Infrastructure

the structures that emphasize, organise and enable social functions. Individual units of infrastructure are known as assets. It is sometimes subcategorised into economic infrastructure, the networks of built assets that

Read More »
Diagram comparing coordination failure and selective coordination between protective devices in an electrical system. The top section shows a 32Amp circuit tripping a 63Amp breaker, causing upstream devices rated 125Amp and 160Amp to disconnect unnecessarily. The bottom section demonstrates selective coordination, where a 125Amp device isolates the fault without affecting upstream devices rated 250Amp and 600Amp.
Blog
Jarek Wityk

Breaking capacity

IWE-S1-IWE- E8_Breaking Capacity of MCCB What is Breaking Capacity (kA) Breaking capacity, often referred to as short-circuit breaking capacity, is one of the most critical specifications of a protective device.

Read More »

Enabling Tools

Tools that help design, develop, deliver, and maintain the built asset. You may require a number of different enabling tools for specific tasks and functions. https://www.thenbs.com/knowledge//periodic-table-of-bim

Read More »

validation

confirmation, through the provision of objective evidence, that the requirements for a specific intendeduse or application have been fulfilled [SOURCE: BS EN 17412‑1:2020] For example, it is the process of

Read More »

asset management

coordinated activity of an organization to realize value from assets Note 1 to entry: Realization of value will normally involve a balancing of costs, risks, opportunities and performance benefits.Note 2

Read More »

Post-appointment BEP

Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead

Read More »

System of engagement

The System of Engagement is defined as a platform that manages supported digital engagement, of systems like Browsing, Web Chat, Messaging, videos (Facebook, WhatsApp, TEAMS, ZOOM, Signal, Slack, etc.), various

Read More »

BS 8541-2:2011

Library objects for architecture, engineering and construction Part 2: Recommended 2D symbols of building elements for use in building information modelling Note: ISO 22014 and ISO 22057 are under development

Read More »

Sub-Process (Collapsed)

The diagram does not show the details of the sub-process. A “plus” sign in the shape’s lower-left corner indicates that the activity is a sub-process with a lower level of

Read More »

property

inherent or acquired feature of an item[SOURCE: BS ISO 6707-1:2017, 3.7.1.3] NOTE Examples include thermal efficiency, heat flow, sound reduction index and acoustic power level.PAS 14191:2020

Read More »

BS 8541-4:2012

Library objects for architecture, engineering and construction Part 4: Attributes for specification and assessment – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede BS 8541,

Read More »
How To
Jarek Wityk

Electric Vehicle Charging Points

Active charging points are fully wired and connected, ready-to-use charging points.
A passive charging point, on the other hand, is the infrastructure without the final charging unit installed.

Read More »

Dimensionality

A dimension of space, such as width, height, or length. can be zero-dimensional (location point), one-dimensional (e.g. line, curve, path), two-dimensional (e.g. surface, face), or three-dimensional (e.g. surface, face) (e.g.

Read More »

Unified Modelling Language (UML)

language to provide system (3.13) architects, software engineers, and software developers with toolsfor analysis, design, and implementation of software-based systems as well as for modelling businessand similar processesNote 1 to

Read More »

BS 8536-1:2015

Briefing for design and construction Part 1: Code of practice for facilities management (Buildings infrastructure)

Read More »

The Centre for Digital Built Britain

The Centre for Digital Built Britain (CDBB) CDBB is a partnership between the University of Cambridge and The Department for Business, Energy and Industrial Strategy (BEIS). It is the custodian

Read More »

Quality Planning (QP)

Quality Planning (QP) is a framework which specifies quality standards, practices, resources, and the sequence of activities The quality plan should define:[1] Objectives to be achieved A workflow that represents

Read More »
Dictionary
Jarek Wityk

metadata

ELI5-S1: BIM Basics E6: Metadata explained Understanding Metadata in Building Information Modeling (BIM) Metadata provides critical information about an item’s content, making it easier to locate and work with specific

Read More »
Blog
Jarek Wityk

Level of information need

Ever feel like you’re drowning in BIM data you don’t need, or scrambling for details that should’ve been there? Enter the concept of Level of Information Need. It’s a straightforward idea buried behind a not-so-straightforward name (looking at you, BS EN ISO 7817-1:2024). In plain English, a Level of Information Need defines exactly what information should be delivered – no more, no less – for a given BIM use case or project stage.

Read More »

Information Controller

Responsible for setup and management of the Common Data Environment (CDE), document submission, RFI and other project document transactions. [Appointment: Lead Appointed Party Information Controller, site-based/office based.] [source] PDE 4301

Read More »

Industry 4.0

Industry 4.0 is more than just manufacturing. Smart, connected technologies transform how we design, manufacture, use and maintain parts, products, and entire buildings. The interconnected technology also changes the way

Read More »

AD Hoc Group (AHG)

AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting. The group is disbanded after

Read More »
On this page

    share this page