Search filters
Search in title
Search in content
Exact matches only
Filter by Categories
Select all
Academy
AI
Automation
Blog
BPMN
Classification and Standardisation
Common Data Environment (CDE)
Dictionary
Digital Twin
Electrical
Fire
How To
Level of
Management
Organization of information
Procurement
Requirements
Standards
State
Sustainability
Uncategorized

Dictionary
Digital Construction (electrical)

term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project and asset information

Read more…

forms a framework that supports informed and consistent decision making by project teams, at each work stage, helping to deliver agreed and reliable information.

Read more…

Exchange Information Requirements (EIR) term introduced by BS EN 19650 replace the PAS 1192 term Employer Information Requirements (EIR) on all projects where BS EN ISO 19650 compliance is required.

Read more…

The term introduced by ISO 19650 typically describes the Tier 1 Main Contractor.

Read more…

breakdown structure to help plan the production of information

Read more…

schedule of information containers and delivery dates, for a specific task team

Read more…

An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail.

Read more…

model validation checklist

The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes.

Table 1 – Model Validation Checklist

CheckDefinition
Project Coordination CheckEnsure the correct location of the building across all models of all disciplines.
Model Element CheckEnsure that those model elements are correct according to the standard. 
Model Integrity CheckEnsure the correct location and reference of the model elements.
Interference CheckDetect problems in the model where two building components are clashing
Link File checkEnsure that all links will be valid and easy for further use 
Excess Information CheckEnsure that there is no unnecessary information in the model.
File Location CheckEnsure that all the files in the Central Workspace are valid and incorrect location. 

Modelling or Phase Planning include simulation model of the construction process to:

1.1 Model has Acquired Coordination from GRID.rvt

1.2 All Grid and Level are Copied-Monitored from GRID.rvt

1.3 Survey Point and Project Base Point are in the correct position (Refer to BEP XX.XX Project Coordinate)

1.4 Project Base Point is located on the correct gridline (X, X) and has been clipped

1.4 For the project with links file: All files are drawn at the correct level.

Lead Appointed Party Standards BEP and Model Element Check

  • 2.1 File naming is correct according to the standard (Refer to BEP XX.XX Identification Convention)
  • 2.2 Family Name and Type Name are correct according to the BIM standard
  • 2.3 Family’s Type Mark is correct according to project specification
  • 2.4 Use family from the appropriate category (Refer to BEP XX.XX Family Management)
  • Model have required elements and information in the elements as specified in Model Ownership
  • MEP ONLY: Ducts and Pipes are in the correct System Classification and System Type

[source] PDE 4301 Technical BIM Management 2019/2020, BIM EXECUTION PLAN, SUP-GPF-XX-XX-SP-W-0001, Post-appointment BEP, Grat To King Yeung, Jarek Wityk, Mike Sealey, Tala Damra, Viorel Mihailuc, Willow Williams

Leave a Reply

Your email address will not be published. Required fields are marked *

share this page