Stage 2 Maturity

BIM at Maturity Stage 2 according to the ISO 19650 Framework is “the use of a shared digital representation of a built asset to facilitate design, construction and operation workflows to form a reliable basis for decisions”[1]. The concept of sharing information in a BIM workflow allows project parties to have access and use digital information to simulate and display a project at different stages of development throughout its lifecycle, facilitating the decision-making process while taking into consideration the input and feedback of the parties involved.

BIM documentation plays a crucial function in the success of implementation on organisational and project levels.

[1] BS EN ISO 19650-1, 2018

Blog
Jarek Wityk

Emergency Lighting in Toilet Cubicles

Summary
1. If the toilet has borrowed light and is less than 8m square:
a. There is no need for emergency lighting, however,
b. If there is a cubicle with full height door – therefore closed without borrowed lighting – then the EM lighting would be required in that cubicle.
2. If the overall toilet has no borrowed light,
a. And the WC cubicles do not have full-size doors; there should be at least one emergency outside row of cubicles.
b. If there is a cubicle with full height door – therefore closed without borrowed lighting – then the EM lighting would be required in that cubicle.

Read More »

share this page

Leave a Reply

Your email address will not be published. Required fields are marked *