4D Modeling
4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains
4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains
evidence required for considering that requirements have been fulfilled [cited from ISO 19650-2:2018(en), 3.1.1.1] Information issued via the Common Data Environment (CDE) must comply with
An identifiable chunk of work with recognized prerequisites to begin and a recognized State of Completion – or Conditions of Satisfaction. Another way to look
A task is an atomic activity that is part of a process. When the work in the process is not broken down to a finer
person, organization or organizational unit involved in a construction process [cited from ISO 19650-1:2018(en), 3.2.1]
AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting.
Additive manufacturing (AM), also known as 3D printing, is the process of creating products by layering materials until a complete 3D object is created. The
Adiabatic checks are required to determine whether conductorsmight be damaged by the thermal effects resulting from the level of calculated fault conditions.
…’An agent is just something that acts (agent comes from the Latin agree, to do). Of course, all computer programs do something, but computer agents
The temperature of the free air surrounding a cable,or in the case of cables installed in the ground, the temperature of the surrounding soil.For an
Ambient temperature rating factor used for calculating theminimum required cable size. For cables installed in air, values for this factor are given in BS7671:2018 Table4B1.For
American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) is a professional organization that develops and promulgates system, measurement, and product engineering standards to
The appointed party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Supplier’ Typically it means Tier 2 and
ELI5-S2: BIM in Practice E6: Appointed Party context of information exchange Understanding the Appointed Party (T2-T4) Context of Information Exchange in BIM Welcome to the
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information
Appointing party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Employer’ ISO 19650 term depends on where in
ELI5-S2: BIM in Practice E4: Appointing Party context of information exchange Understanding the Appointing Party (T0) Context of Information Exchange in BIM Welcome to the
Equivalent to PAS1192 term ‘Contract’ The more generic term appointment has been used in ISO 19650 instead of contract. This means one term can be
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information
The meaning of the term Industry 4.0 has not been concluded. There is a level of ambiguity of what it means for the construction industry[1]
Architecture, Engineering, Construction and Operation usually expressed as acronym AECO is an extension of the Architecture, Engineering, Construction (AEC). Both terms are related to the
History of project information, such that any non-current published information in the published area should move into this area. New parties to the project will
area of an expert’s […] proficiency and knowledge associated to one or several groups of properties BS EN ISO 23386:2020
Model(s) based on Fabrication Shop Model(s) and installed conditions.1 1 1 The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
An asset is anything that has potential or actual value, whether a resource or a value that can be converted into capital. An organisation or
The Asset Information Model or AIM is a term used to define the set of information gathered from all sources that support the continuing management
Term introduced by ISO 19650 set of standards is related to information required during the operation phase of an asset AIR define managerial, commercial and
coordinated activity of an organization to realize value from assets Note 1 to entry: Realization of value will normally involve a balancing of costs, risks,
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment
Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192]
An association is used to link data and artefacts to flow objects. Non-flow objects, such as text and graphics, can be associated with flow objects
Association Française de Normalisation Asociation French Normalization Organization Regulation
Depending on the technology discussed, the term attribute can be treated as equivalent to a property or as a set of attributes, such as the
Circuit-breaker manufacturers publish tables showing combinations of pairs of circuitbreakers, one upstream,one downstream,where the downstream device can be used at a location where the prospective
Protection against electric shock under fault-free conditions;use of barriers,placing out of reach,and so forth.
Building Information Modelling (BIM)[1] broadly describes the processes employed during digital information management related to a built asset such as a building, bridge, highway or
Introduction The term referred to as Lean Construction aims to reduce overproduction, minimise handling, storage, transportation, or remove processes that do not add value. The
Introduction There are companies in the construction industry which do not favour standardization; these companies benefit from revenue and profits from change orders (variations), inevitably
BIM Collaboration Format (BCF) is an open file format that allows the addition of textual comments, screenshots, and other information on top of the IFC
The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to
ELI5-S1 BIM Basics E17_BIM Functions Understanding BIM Functions: A Simple Guide for Beginners Building Information Modeling (BIM) is transforming the construction industry by enabling better
The transition from the BIM Levels to the concepts in the ISO 19650 series and the UK BIM Framework represents a shift in how we
ELI5-S1:BIM Basics: E13_Understanding BIM Stages Understanding BIM Stages: Transitioning from BIM Levels to a Modern Framework In the world of Building Information Modeling (BIM), we
Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM
a plan of action designed to achieve a long-term or overall aim. Definitions from Oxford Languages Required to define and understand what your company is
I decided to challenge myself and explore existing and emerging technologies in order to estimate what could we achieve during the next 30 years. The
A Use Case is a description of an intended use of the BIM, along with a description of the type(s) of data that must be
The term BIMwash is derived from Whitewash, “a cheap white paint or coating of chalked lime used to quickly give a uniform clean appearance to
The blockchain is a transaction database shared by all nodes involved in the system based on the Bitcoin protocol. It is a data structure consisting
decomposition of a defined scope into progressively more detailed levels
The breaking capacity of a circuit-breaker is themaximum level of fault current (kA) it cansafely interrupt. Each circuit-breaker has two breaking capacities: Ultimate BreakingCapacity (Icu)
Collaborative business relationship management systemsPart 2: Guide to implementing BS ISO 44001
Design management systems Part 10: Vocabulary of terms used in design management
Design management systemsPart 4: Guide to managing design in construction
Information security management systemsPart 3: Guidelines for information security risk management (revision of BS ISO/IEC 27005:2011)
Briefing for design and construction Part 1: Code of practice for facilities management (Buildings infrastructure)
Briefing for design and constructionPart 2: Code of practice for asset management (Linear and geographical infrastructure)
Library objects for architecture, engineering and constructionPart 1: Identification and classification – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede
Library objects for architecture, engineering and construction Part 2: Recommended 2D symbols of building elements for use in building information modelling Note: ISO 22014 and
Library objects for architecture, engineering and construction Part 3: Shape and measurement – Code of practice Note: ISO 22014 and ISO 22057 are under development
Library objects for architecture, engineering and construction Part 4: Attributes for specification and assessment – Code of practice Note: ISO 22014 and ISO 22057 are
Library objects for architecture, engineering and construction Part 5: Assemblies – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede BS
Fire safety in the design, management and use of buildings – Code of practice
Building Information Modelling — Level of Information NeedPart 1: Concepts and principles
Building construction – Organization of information about construction works Part 2: Framework for classification
Building construction — Organization of information about construction works Part 3: Framework for object-oriented information
Environmental management systems General guidelines on implementation
Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries Part 1: Data schema
Data structures for electronic product catalogues for building services—Part 2: Geometry
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 1:
BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Information State (at any project stage): Work in progress (WIP) S0 Information developed
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2:
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling Part 3:
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) Information management using building information modelling Part 5: Security-minded
Information container for linked document delivery — Exchange specification Part 1: Container
Information container for linked document delivery. Exchange specification. Link types
Building information modelling and other digital processes used in construction Methodology to describe, author and maintain properties in interconnected data dictionaries
Building information modelling (BIM) — Data templates for construction objects used in the life cycle of built assets Concepts and principles
Building information models – Information delivery manual Part 1: Methodology and format
Building information models — Information delivery manual Part 2: Interaction framework
Risk management guidelines ISO 31000 is an international standard first published in 2009, the current version published in 2018. The standard contains principles and guidelines
Facility management Management systems Requirements with guidance for use ISO 41001 and the vocabulary published as ISO 41011 is a Facilities Management Standard developed by
Quality management systems Requirements ISO 9001 is a set of quality management principles defined by various criteria and standards. It outlines the importance of defining
Information technology – Security techniques – Information security management systems – Overview and vocabulary ISO 27000 is derived from the British Standard 7799, published in
Guidance on project management ISO 21500 describes guidelines for managing projects and processes in project management, including standards, methods, and processes. The standard is intended
Organization of information about construction works Framework for management of project information
Collaborative business relationship management systems Requirements and framework
Collaborative business relationship management systems Guidelines on the implementation of ISO 44001
Asset management Overview principles and terminology The ISO 55000 standard integrates with other essential management systems by outlining definitions and terminologies for asset management. Published
Asset management — Management systems Guidelines for the application of ISO 55001
Data quality Part 2: Vocabulary ISO 8000 is an emerging technology standard for organizations that want to improve business processes and control operating costs throughout
Information technology—Process assessment Process measurement framework for assessment of process capability
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must
Coordination of Builders work in connection to services i.e. openings in walls or floors for MEP Services It is anticipated that as a minimum, all
It is a UK green building certification system, launched in 1990 by the Building Research Establishment (BRE), similar to LEED. Both systems confirm the level