replacement request
A replacement request corresponds to the creation of the property and the deactivation of the property it replaces. After validation of the replacement request by
A replacement request corresponds to the creation of the property and the deactivation of the property it replaces. After validation of the replacement request by
means the level of skill and care applicable to the Party’s equivalent obligation under the Appointment. [1] [1] UK BIM Framework, 2020. Information protocol to
AResidual Current Device (RCD) is amechanical switching device or association of devices intended to cause the opening of the contacts when the residual current* attains
In the context of project management, the resources refer to optimizing the use of resources for successful project execution and the management of resources in
Resources Description Framework (RDF) major component of the semantic web as they provide a means for identifying resources with Namespace (NS)
a chart that describes the participation by various functions in completing tasks or deliverables [cited from ISO 19650-1:2018(en), 3.1.1] Responsibility matrix shall be developed to
Info Below you can find a couple of sample notes intended to be copied and pasted to a transmittal when sharing Restricted and Highly Restricted
amount and type of risk that an organization is willing to pursue or retain [cited from ISO 19650-5:2020(en), 3.5]
Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in
BIM roles are not necessarily related to specialist positions. It should be viewed as a function that could be fulfilled by more than one person
RIBA Plan Of Work 2020 0 – Strategic Definition is about determining the best means of achieving the client’s requirements. An open mind is required
Bid response should include a scope management plan containing all the tasks necessary for successful project delivery. The plan shall define the implementation and verification
alternative or supplementary electrical energy sources has become more viable, typical secondary power supply (SPS) Photovoltaic (PV) power Wind turbine power standby generator
state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]
infraction or violation of security (3.7) [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
A document (or part of a document) identified in the Information Particulars setting out the security requirements for carrying out the Works in a security-minded
Resolving Selectivity Issues in Electrical Design Free Trimble ProDesign Introduction Training Course Click the button below for more details: ProDesign Course Selectivity is achieved where,under
The Semantic Web, as defined by Ontotext[1] is the extension of the existing information and data on a network (or Web) to include data descriptors,
The rating factor Cf = 0.725 is applied to cable sizing calculations for any circuit protected by a semi-enclosed fuse to BS3036.
ELI5-S1 BIM Basics E16_Sensitive Information information, the loss, misuse or modification of which, or unauthorized access to, could:(a) adversely affect the privacy, welfare or safety
A sequence flow is used to show the order in which activities in a process or choreography will be performed.[1] Symbol 1] Silver, B. (2009).
Set-Based Design commonly referred to as a set-based design innovation or set-based concurrent engineering. It is a product development approach where teams consider a wide
All project Model Authors’ information for the use of the entire project team. The Federated Model Manager will combine all information for checking against the
ELI5-S2: BIM in Practice E1: Shared context of information exchange Introducing the “ELI5-S2 BIM in Practice” Series! Welcome to the first post in our new
In AEC industry with reference to information systems management, the single source of truth refers to Common Data Environment (CDE) The single source of truth
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information
The term “smart building” was originally introduced by the European Union in the Energy Performance of Buildings Directive (EPBD)[1] as one of the main enablers of the
The acronym SMART has been defined by the PAS 1192‑2: 2013 clause 5.1.3. the term means that Information req BS ISO 31000:2018 PAS 11922: 2013
Relates to the ability of the soil, in which the cable is installed, to conduct heat energy away from the cable. The rating factor Cs
A spacial asset can be defined as a specific location such as a zone, boundary, area, floor or room with a known location and extents.For
The Specialist BIM Coordinator duties will reflect those for the Project BIM Coordinator but will be specific for discipline or trade-specific models and data deliverables.
relation between kinds of things that relates two concepts whereby the subtype concept is a more specific concept than the supertype concept and has all
BIM at Maturity Stage 2 according to the ISO 19650 Framework is “the use of a shared digital representation of a built asset to facilitate
A start event specifies where a process will begin. Start events can only react when a trigger is “caught.” Symbol 9). BPMN Method and Style:
A message is received from a participant, which initiates the process. The actual recipient of the message can be identified by connecting the event to
Identifier indicating the characteristic of an element of information for which at all times a value can be established. Word status has been included in
Objectives of BEP shall be allignwed with Exchange Information Requirements (EIR), an example of Strategic Objectives for a project have been listed below: Meet Level
A sub-process is a group of activities that are performed as part of a larger process or choreography. It is compound in the sense that
The diagram does not show the details of the sub-process. A “plus” sign in the shape’s lower-left corner indicates that the activity is a sub-process
The sub-process boundary is expanded, and the details (a process) are visible within it. It is important to note that sequence flows cannot cross the
a Subcommittee (SC), which addresses a specialized area within a TC; https://www.iso.org/glossary.html
Where circuits are grouped, there are two availablemethods of calculating the rating factor Cg to be applied: [BS7671:2018,Appendix 4,5.1.2:Equation 2] [BS7671:2018,Appendix 4,5.1.2:Equation 3,4]
degree to which a product, system or information provides functions that meet stated and implied needs when used under specified conditions [cited from: ISO/IEC 25010:2011(en),
In the construction industry, ‘supplier’ refers to a provider of services or goods. The supplier can provide goods or services directly to the ultimate client
Term used to describe the relationship between organisation that provide materials, products or services for the client. Referring to ISO 19650 Framework the supply chain
Supporting information shall be used where applicable and relevant to fully understand and evaluate information requirements or acceptance criteria. Supporting information includes but is not
interacting objects organized to achieve one or more stated purpose [SOURCE: ISO/IEC/IEEE 15288:2015, 4.1.46, modified — The words “combination of” at the beginninghave been removed;
The System of Engagement is defined as a platform that manages supported digital engagement, of systems like Browsing, Web Chat, Messaging, videos (Facebook, WhatsApp, TEAMS,
A system of insights can helps your company make decisions, and it is designed to be part of business decision-making process. It involves gather data,
A system of systems is a collection of many different systems, each with its own characteristics. [1] System theory assumes that certain underlying concepts and
System thinking is an approach to integration based on the idea that each component or part of a system acts differently when isolated from its
Target Value Designs (TVD) focus is on reducing the cost of a project without reducing the quality of the end product or extending the timetable.
schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined
The term, introduced by ISO 19650, describes a team of people working together on a specific task. task team might be an individual appointed party,
A system for naming and organizing a set of words or phrases, into groups that share similar qualities, used for organising information and primarily intended
Technical Committee – Buildings and civil engineering works https://www.iso.org/committee/49070.html
The competence and understanding of BIM, of the consultants and delivery team partners to be involved in the project, shall be assessed and results included
a Technical Committee (TC), which develops standards in a certain sector or industry; https://www.iso.org/glossary.html
term coined by Deloitte[1], it is a current situation where whilst businesses conceptually understand the significant changes that information Management (IM) and technology may bring,
The use of terms such as Lead Appointed Party, Appointed Party and Task Team in lieu of terms: employer, supplier, contractor and subcontractor, require clarification
A Uninterruptible Power Supply (UPS) or standby generator connected to dedicated final circuits of the distribution infrastructure. Enhance the infrastructure resilience and can improve maintenance
Text annotations are a way for a modeller to provide additional information to a BPMN diagram reader. The text annotation object can be associated with
The Centre for Digital Built Britain (CDBB) CDBB is a partnership between the University of Cambridge and The Department for Business, Energy and Industrial Strategy
The future of BIM Manager The ‘BIM Manager’ role is discussed here in broad terms of management, not confined into a specific BIM role.[1] The
Purpose: Must have clear purpose Public good Must be used to deliver genuine public benefit in perpetuity Value creation Must enable value creation and performance
Introduction One of the challenges is the Appointing Party’s difficulties with the development of successful Operational Information Requirements in relation to asset management. Understanding the
The ISO 19650 set of standards introduces a new term: ‘Level of information need’ which is designed to replace the terms used in BS EN
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of
Ci Rating factor used for calculating theminimum required cable size for cables run in thermal insulation. See BS7671:2018 Table52.2.
The rating factor Cs is applied to cable sizing calculations for cable installed in the ground. Its value varies according to the thermal resistivity of
person or body that is recognized as being independent of the parties involved with the issues in question [1] Note 1 to entry: “Parties involved” are
In the construction industry, Tier 1 is a Contractor referred in ISO 19650 as the Lead appointed party, who provide goods or services directly to
In the construction industry, Tier 2 is a Contractor referred in ISO 19650 as the Appointed party with a sub-contract who provide goods or services
In the construction industry, Tier 3 is a sub-contractor referred in ISO 19650 as the Appointed party and Task Team, with a sub-contract who provides
A system having one or more points of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to that point by
person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]
A system having one point of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to earth electrodes electrically independent of
A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability
The modern era of IT has turned to ubiquitous access to all organizations and users. The vision is to provide one “universal access,” i.e. access
The UK BIM Framework was developed by the UK BIM Alliance, BSI, and the Centre for Digital Built Britain associated with the Construction Industry Council
UK BIM Framework roadmap! Almost three years have passed since the first BS EN ISO19650-1 standard was published.A lot of work has been done; some
The field ‘Role’ has been renamed ‘Discipline’ in the most recent edition of BS EN ISO-2 19650-2:2018 NA February 2021. The previously used role codes,
provides the data structure for data templates using objects, collections and relationships between them. The multiplicities in the UML diagram specify the range of allowablecardinality
A unified cloud platform (UCP) has been introduced to facilitate the integration of multiple cloud services into a single cloud environment. The UCP is essentially
language to provide system (3.13) architects, software engineers, and software developers with toolsfor analysis, design, and implementation of software-based systems as well as for modelling
An uninterruptible power supply (UPS) is used to maintain the supply to an essential service duringmains supply outages. On loss ofmains supply,a storage device in
standard measurements of physical quantities that require a clear definition to be useful. The International Bureau of Weights and Measures (BIPM) is responsible for ensuring
The United States Army Corps of Engineers is an engineer formation of the United States Army that has three primary mission areas: engineer regiment, military
Overview Visual Alarm Devices (VADs) Welcome to our guide on Visual Alarm Devices (VADs). Sourced from leading standards and guidelines, including the CoP-0001 Loss Prevention
confirmation, through the provision of objective evidence, that the requirements for a specific intendeduse or application have been fulfilled [SOURCE: BS EN 17412‑1:2020] For example,
What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Includes all the processes and activities used to design, produce and deliver the product or service to the Customer.[1] [1] The Massachusetts Port Authority, 2015.
A diagram of every step involved in the material and information flows needed to bring a product from request to delivery. [1] [1] The Massachusetts
VEAM connectors refer to a specific type of electrical bayonet type connectors known for their robustness and reliability in harsh environmental conditions. These connectors are
confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service