ELI5-S1:BIM Basics: E13_Understanding BIM Stages Understanding BIM Stages: Transitioning from BIM Levels to a Modern Framework In the world of Building Information Modeling (BIM), we often come across terms like
The transition from the BIM Levels to the concepts in the ISO 19650 series and the UK BIM Framework represents a shift in how we think about BIM maturity. However,
Circuit-breaker manufacturers publish tables showing combinations of pairs of circuitbreakers, one upstream,one downstream,where the downstream device can be used at a location where the prospective fault current (Ipf) is higher
IWE-S1-IWE- E8_Breaking Capacity of MCCB What is Breaking Capacity (kA) Breaking capacity, often referred to as short-circuit breaking capacity, is one of the most critical specifications of a protective device.
Protection against electric shock under fault-free conditions;use of barriers,placing out of reach,and so forth.
On projects where ISO 19650 Framework has implemented a term, Pre-appointment BEP is used instead of the PAS 1192 term Pre-contract BEP. The meaning is the same, it communicates on
This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead Appointed Party and
The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to successfully deliver the BIM workflows
Building Information Modelling (BIM)[1] broadly describes the processes employed during digital information management related to a built asset such as a building, bridge, highway or tunnel. ISO 19650 outlines a
BIM Collaboration Format (BCF) is an open file format that allows the addition of textual comments, screenshots, and other information on top of the IFC model layer for improved communication
PD 19650‑0:2019 In short, the BuildingSMART Data Dictionary is a library for everything to do with the building. NumberName is an int key and string value that can be stored
Building construction – Organization of information about construction works Part 2: Framework for classification
Building construction — Organization of information about construction works Part 3: Framework for object-oriented information
Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries Part 1: Data schema
Data structures for electronic product catalogues for building services—Part 2: Geometry
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 1: Concepts and principles
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2: Delivery phase of the assets
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling Part 3: Operational phase of the assets
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) Information management using building information modelling Part 5: Security-minded approach to information management
Information container for linked document delivery — Exchange specification Part 1: Container
Organization of information about construction works Framework for management of project information
Building information modelling and other digital processes used in construction Methodology to describe, author and maintain properties in interconnected data dictionaries
Building information modelling (BIM) — Data templates for construction objects used in the life cycle of built assets Concepts and principles
Building information models – Information delivery manual Part 1: Methodology and format
Building information models — Information delivery manual Part 2: Interaction framework
a plan of action designed to achieve a long-term or overall aim. Definitions from Oxford Languages Required to define and understand what your company is trying to achieve with BIM.
The term BIMwash is derived from Whitewash, “a cheap white paint or coating of chalked lime used to quickly give a uniform clean appearance to a wide variety of surfaces”. Metaphorically, to
It is a UK green building certification system, launched in 1990 by the Building Research Establishment (BRE), similar to LEED. Both systems confirm the level of the sustainability performance of
The blockchain is a transaction database shared by all nodes involved in the system based on the Bitcoin protocol. It is a data structure consisting of linked blocks (e.g. confirmed