Workflow comparison First, I constructed an information exchange process diagram based on ISO 19650 Part 2 dedicated to the delivery phase of an asset lifecycle (project delivery). Next, I have
Building Information Modelling (BIM)[1] broadly describes the processes employed during digital information management related to a built asset such as a building, bridge, highway or tunnel. ISO 19650 outlines a
The Asset Information Model or AIM is a term used to define the set of information gathered from all sources that support the continuing management of an asset
Contract Particulars refer to the document outlining the Framework Agreement’s specific core terms, which may include but are not limited to the Pricing Schedule, Authorised Officer, Contract Manager, Key Personnel,
I decided to challenge myself and explore existing and emerging technologies in order to estimate what could we achieve during the next 30 years. The question is considered in terms
The field ‘Role’ has been renamed ‘Discipline’ in the most recent edition of BS EN ISO-2 19650-2:2018 NA February 2021. The previously used role codes, derived from BS 1192:2007, had
BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Information State (at any project stage): Work in progress (WIP) S0 Information developed within a task team [C],
BS EN ISO 19650-2 2018 BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Suitability Action by Information State (at any project stage): Work
Introduction It can be said that the digitalization of construction began with designers moving from drawing boards to computers. [1] In Architecture, Engineering, Construction and Operation (ACEO), the focus has
The use of terms such as Lead Appointed Party, Appointed Party and Task Team in lieu of terms: employer, supplier, contractor and subcontractor, require clarification to become legally binding. The
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of dedicated BIM management role within
The psychology of workplace collaboration can be traced back to the everyday interactions that occur in any organization. In the fast-evolving business world, there is a rising need to move
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
The ISO 19650 set of standards introduces a new term: ‘Level of information need’ which is designed to replace the terms used in BS EN 1192 such as Level of
History History’s Professor, Yuval Noah Harari, in his book Homo Sapiens reached a conclusion that humans developed an ability to transmit information about things that do not really exist (stories),
The future of BIM Manager The ‘BIM Manager’ role is discussed here in broad terms of management, not confined into a specific BIM role.[1] The function of BIM Manager already