Dictionary
Jarek Wityk

federation strategy

ELI5-S1: BIM Basics E4: Federation Strategy Explained The purpose of the federation strategy and the Information Container (model) breakdown structure is to help plan the production of information by separate

Read More »

Lane

A lane is a sub-partition within a process (often within a pool) that runs the length of the process level, either vertically or horizontally. Lanes are frequently used for internal

Read More »

Data Object

Data objects provide information about the activities that must be performed and/or the results that they produce. Elements of data objects must be contained within process or sub-process elements. Data

Read More »

Group

Because a group is not an activity or a flow object, it cannot connect to sequence or message flows. Furthermore, groups are not constrained by pool and lane restrictions. [1]

Read More »

Text Annotation

Text annotations are a way for a modeller to provide additional information to a BPMN diagram reader. The text annotation object can be associated with a specific object on the

Read More »

Information Delivery Manual (IDM)

information delivery manual (IDM) Documentation that captures the business process and specifies in detail the information that a user performing a particular role is required to provide at a particular

Read More »

Parametric behaviour

The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object or the context in which

Read More »

Dimensionality

A dimension of space, such as width, height, or length. can be zero-dimensional (location point), one-dimensional (e.g. line, curve, path), two-dimensional (e.g. surface, face), or three-dimensional (e.g. surface, face) (e.g.

Read More »

Contract Particulars

Contract Particulars refer to the document outlining the Framework Agreement’s specific core terms, which may include but are not limited to the Pricing Schedule, Authorised Officer, Contract Manager, Key Personnel,

Read More »

BIM thinking ahead

I decided to challenge myself and explore existing and emerging technologies in order to estimate what could we achieve during the next 30 years. The question is considered in terms

Read More »
Blog
Jarek Wityk

How to respond to request for proposal (RFP)

Introduction It can be said that the digitalization of construction began with designers moving from drawing boards to computers. [1] In Architecture, Engineering, Construction and Operation (ACEO), the focus has

Read More »
Blog
Jarek Wityk

BIM and Lean Construction

Introduction The term referred to as Lean Construction aims to reduce overproduction, minimise handling, storage, transportation, or remove processes that do not add value. The Construction industry recognized the potential

Read More »
Blog
Jarek Wityk

Terminology and UK Contract Law

The use of terms such as Lead Appointed Party, Appointed Party and Task Team in lieu of terms: employer, supplier, contractor and subcontractor, require clarification to become legally binding. The

Read More »
Blog
Jarek Wityk

Quality Management and Standards

Most articles start with a definition of quality management and then dive deep into Quality Control (QC) and Quality Assurance (QA). In here I concentrate on the quality, value and

Read More »
Blog
Jarek Wityk

BIM Classification and Standardization Systems

Introduction There are companies in the construction industry which do not favour standardization; these companies benefit from revenue and profits from change orders (variations), inevitably resulting in claims increasing cost

Read More »

Management of Sustainability in BIM

Introduction Sustainability in terms of Building Information Modelling (BIM) was defined as the sixth dimension of BIM by a large consulting firm as “what to do in terms of sustainability”[1]

Read More »
Blog
Jarek Wityk

The Museum of the Future

Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The

Read More »
On this page

    share this page