PD Tray
v2.36.0Size cable tray, ladder and basket runs for every service on the bracket (power, fire, data, audio-visual, specialist lighting), arrange them by tier, check the supports, and print the record that proves it.
How this works
- Add a run. A run is one containment on the bracket serving one service: a tray, ladder or basket sized here, or a trunking already sized in PD Trunking and added here for the tier arrangement, the fill check and the bracket loading. Drop its cables in, or pick a typical arrangement and edit it.
- Sizing: Runs are sized single layer from cable mix and spacing, or on bunched fill within the usable depth for Data / comms, Audio-visual, Specialist lighting and Extra-low voltage / controls with Lay on Auto or Bunched. Each width, plus spare capacity, is rounded up to the next standard size, split side by side or stacked beyond the largest standard tray. Size trunking in PD Trunking. Each run's grouping factor (Cg) is provided, or the reason none is printed. For Engineering Toolkit subscribers, each run is also checked for load, fixing spacings and fault restraint.
- Arrange the tiers and read the bracket. Engineering Toolkit subscribers assign each run to a tier, and read the segregation checks for the mixed services and the drop rod sizes for the whole bracket (BS 8519 Annex I and Table E.2 on fire-rated routes).
PD Tray is free to run, no signup: after 3 anonymous sessions, you enter an email address to continue. In the free version you size one run at a time, on tier 1. Engineering Toolkit subscribers get more runs, more tiers and the typical arrangements with more than one run or tier. They also get the working behind each grouping factor, the fixing and support panels, the editable Excel / Word / comma-separated values (CSV) / Text exports and My Projects.
Cable grouping factor (Cg): BS 7671 Tables 4C1 / 4C4 / 4C5
Cable fixing & fault restraint: OSG Appendix D / BS EN 61914
Support system: bracket drop-rod loading
- 2,553brackets enumerated on 2.12.0 (30/09/2026) against a separate calculation of the same method from the same data tables, no difference
- 338automated checks re-run before every release; some compare the tool's results with a separate calculation written from the stated rules and data tables, not the tool's code; a Python copy of the method is tested against figures worked out manually
- 143cables in the shared data store, from published datasheets
- 7cases printed to Portable Document Format (PDF) and measured on 2.12.0, every sample arrangement included: text size, page numbers and the drawing page with its frame
- Last reviewed
- September 2026
- Data basis
Show the full record
Containment self-weights: Legrand Swifts, Unitrunk Speedway, Cablofil catalogues. Cleats: Ellis Patents datasheets (Vulcan+ DS03E iss. 06, Atlas DS13E iss. 03, Emperor 07/2026). Cables: 143 in the shared store, from Prysmian and supplier datasheets. SWA to BS 5467 from the Eland Cables dimensions tables, with the 5-core 70 and 95mm² sizes from the Cleveland Cable BS 5467 datasheet (the Eland table stops at 50mm²). Singles: 6491X PVC and 6491B LSZH, 15 sizes each from 2.5 to 300mm², from the Cleveland Cable datasheets. Cat 6A from Brand-Rex and Leviton datasheets, AV and control from Belden technical data. Rod capacities: BS 8519:2020 Table E.2.
- Validated against
- Widths, grouping factors and bracket loads are independently verified against calculations derived from BS 7671 and stored tray and cable data. Version 2.36.0 was last validated on 18/11/2026, passing 519 automated checks, including 302 fault-injection tests.
- Tray, ladder and basket runs arranged by tier on one support bracket.
- Power runs are sized single-layer, not by the 45% space factor; data, AV, specialist lighting and ELV runs are sized as a bunched fill (EN 50174-2:2018 basis).
- A trunking on the bracket by reference with an indicative 45% fill check on its nominal W x D; the trunking itself is sized in the Trunking Size Calculator.
- Grouping factors count the tiers with loaded circuits at the vertical tier spacing you enter; below the 300 mm of Tables 4C4/4C5 Note 3 the manufacturer's figure is asked for.
- Perforated tray, ladder and basket read Reference Methods E and F; an unperforated tray reads Method C.
- The load check is indicative against a representative SWL for the duty chosen, or against the manufacturer's SWL where you enter it (BS EN 61537).
What's changedNovember 2026 · v2.36.0Engineering Toolkit users can print the report’s drawing sheets alone on A3 landscape pages with “Print drawings on A3”. In exported reports, the heading “Bracket load and minimum drop rod size” replaces “Identification colour”. Cable cores are drawn at a heavier line weight. No calculation, size or verdict changes.
- November 2026 · v2.36.0Engineering Toolkit users can print the report’s drawing sheets alone on A3 landscape pages with “Print drawings on A3”. In exported reports, the heading “Bracket load and minimum drop rod size” replaces “Identification colour”. Cable cores are drawn at a heavier line weight. No calculation, size or verdict changes.
- November 2026 · v2.35.0In the Engineering Toolkit, projects are limited to 30 runs. From 30 runs, “+ Add a run” and “Duplicate this run” are greyed. An arrangement that would exceed the limit is not added. Saved projects over the limit open in full and are sized once 30 runs or fewer remain.
- November 2026 · v2.34.0On BS 8519 runs in the Engineering Toolkit, the FP400 warning states the range of approval of BASEC certificate 017/004/340 where an FP400 cable from the list has a size outside it. The warning names these cables and states that the manufacturer’s evidence of fire performance is required.
- November 2026 · v2.33.0The name entered for a Custom cable is now cleared when its line is changed between Custom and a cable from the list, as the Construction, Armour, Fire resistance and Fire alarm cable answers already are. In the free version, the cleared name no longer prevents the run being sized.
- November 2026 · v2.32.0In the free version, request limit messages state the wait, 10 minutes or one minute. A Custom cable name, cable reference or description over its character limit is reported before sizing, with ² or Ø counted as two characters. The empty drawing no longer shows wall gaps above 2,000 mm.
- November 2026 · v2.31.0No saved or new run is sized with out-of-range inputs, over 80 cable lines or blank quantities. Toolkit FP400 warnings for cables under 20 mm also quote BS 8519:2020 clause 11 NOTE 4. Drop rod lines state drops up to 10 m. Wall gaps above 2,000 mm are not dimensioned.
- November 2026 · v2.30.0On single layer runs, each cable can have its own spacing; adjacent cables are spaced at the larger value. Support spacing and other inputs now have ranges; nothing is sized outside them. On BS 8519 routes in the Engineering Toolkit, FP400, and FP600S sizes outside its F120 certificate, get warnings.
- November 2026 · v2.29.0Enter the new drop rod length in the Engineering Toolkit to size the rods with their self-weight. Otherwise, the loads and sizes are unchanged and the longest drop with self-weight is shown. "Parallel" is renamed "side by side" in the tool, printed report and exports. Saved projects keep their layout.
- November 2026 · v2.28.0From 2.26.0 the free Bracket loading tab of a run split over trays showed a service message. It now shows the drawing. In 2.26.0 and 2.27.0 the free page stopped with an error on a cable not in the cable list. It now shows the line naming the cable. On a free split run, a line on Engineering Toolkit layouts replaces the old sentence. The free and Engineering Toolkit pages no longer show the words "Containment drawing". The printed report (Engineering Toolkit only) now gives the reason a run's load is not checked. No calculation, result, size or load changes.
- November 2026 · v2.27.0A Custom cable whose overall diameter is entered above 120 mm is no longer sized: its run is NOT CHECKED, also in saved projects. A new warning in the tool, the printed report and the exports states that the diameter entered is above the 120 mm limit in the tool. With the Engineering Toolkit, the bracket loads and the rod size of a bracket with such a cable are not checked. On the free page, such a cable no longer counts towards the limits on the number of cables and the width. Runs with no such cable are sized as before.
- November 2026 · v2.26.0From 7 November 2026, a run on the free page is over the limits of the free version if it has more than 500 cables or needs a width over 150 m, laid side by side, in trefoil or bunched. A run laid side by side or in trefoil is also over the limits if the spacing between cables, or between trefoil groups, is over 900 mm. A line saying so is then shown in place of the figures. Within the limits, the calculations, results, printed report and exports do not change. Engineering Toolkit runs have no such limits.
- November 2026 · v2.24.0On a split run with a spacing between its cables, where the tray widths add up to less than the required width and no layout is chosen, a new sentence in the tool after the split advice says why. The printed, exported and emailed reports include it in that run's note. The calculations, results and drawing do not change.
- November 2026 · v2.23.0A split run with a spacing between its cables can need fewer or narrower trays, never more. Its grouping factor can change, be printed where 2.22.0 printed none, or not be printed where a tray's circuits go beyond the BS 7671 table. Width remedies with a figure are worked out again and shown only where they pass and no passing check then fails; "move cables to another run" is offered last. With the Engineering Toolkit, the drop rod of a spaced split run can be one size smaller or larger, and load and grouping remedies are worked out again in the same way. With the Toolkit, a split run's load is checked on its heaviest tray with the spare, so the check can now pass where it failed, and a run whose single-core cables have no On-Site Guide Table D1 class is stated as not checked for fault restraint.
- November 2026 · v2.22.0On a split run, cables are now shared by one rule, whatever the order of entry. A circuit entered as more than one cable line can go on different trays. The number of trays, widths, bracket and drop rod loads and grouping factor can differ from 2.21.1. A required width, spare included, that equals a tray width within 0.01 mm now gets that width, which can mean one width narrower or one tray fewer. Unless you enter a containment weight, the makers' widths apply: heavy duty tray starts at 75 mm, ladder at 150 mm, and basket stops at 600 mm, so a wider basket run is now split and its drop rods are sized. On medium and heavy duty tray, cables needing least room by the return flanges now go at the two sides, so some runs need a narrower tray and a few a wider one.
- October 2026 · v2.21.1With PD Cable Database active, nothing changes for you: the calculations, results, wording in the tool, printed report and exports are as in 2.21.0. PD Tray's own copy of the cable list, the cable list address as PD Tray served it and the PD Tray admin page that showed the list are taken out; they were used only while PD Cable Database was not active. The same address is still answered from PD Cable Database. Without PD Cable Database active, no result is shown, as in 2.21.0. No data is removed.
- October 2026 · v2.21.0A listed cable's cores, armour, fire resistance and cable picker group are now read from PD Cable Database. SPLITC-3c35-LSOH, SPLITC-1c35-PVC and STRC-1c35-CNE have none stated: dependent checks, Reference Method included, are not made. In trefoil runs, SPLITC-1c35-PVC and STRC-1c35-CNE are laid flat, so wider or more trays (REVIEW WIDTH or SPLIT) and higher bracket and drop rod loads can result. Cleat spacing on their runs can be wider. With these three, or a Custom single-core cable with armour or fire resistance not answered, the force between conductors and per cleat can be higher. The basis cleat product named can change, or none is named. A warning on the run names cables marked source needed or not in the current datasheet. The perforated tray factor note is re-worded only. A report saved from 2.21.0 lists later cable changes when re-opened. Without the cable list loaded, no result is shown.
- October 2026 · v2.20.1The report's trunking fill item and the trunking width and depth tips no longer call every size nominal: a Custom size section is at its internal size. The report states its Table 4C4 and 4C5 perforated tray factors are for horizontal tray, so a run on vertical tray is not checked by them. Results are unchanged for the same inputs.
- October 2026 · v2.20.0Trunking runs are now checked, and their Utilisation shown, against the 45% space factor with the spare kept free. In the free version and with the Engineering Toolkit, a typed spare of 1 or less is now read as a percentage, so 1 means 1%, not 100%. A re-opened report lists each run size, verdict and bracket changed since saving.
- October 2026 · v2.19.5Runs of over 24 cables with trefoil groups and cables laid flat now have the mixed formation caption and warning. The non-sheathed cable warning quotes the trunking condition of BS 7671 Reg 521.10.1. For unperforated tray, the printed report states how Table 4C4 is read between rows and columns. Widths, grouping factors and verdicts are unchanged for the same inputs.
- October 2026 · v2.19.4The grouping factor (Cg) of multicore runs laid single layer on unperforated tray with more than one tier is now read from BS 7671 Table 4C4; where none can be read, the reason is printed. Re-check those runs. Runs on tray, ladder or basket with protective conductor cables have a note. Widths and verdicts are unchanged for the same inputs.
- October 2026 · v2.19.3On the page for sizing another PD tool's tray runs, runs on tray, ladder or basket with a cable from "Single-core low smoke zero halogen (LSZH) 6491B (trunking runs only, Reg 521.10.1)" are now answered "not worked out". A program fault on one report affects only that report. The free version and widths on PD Tray's own page are unchanged.
- October 2026 · v2.19.2On the page for sizing another PD tool's tray runs, trunking runs and runs set too narrow are now answered "not worked out", with a reason and no width, as are runs whose cables have no diameter, not left out. Each report is answered separately. PD Tray's own page, results for the same inputs and the free version are unchanged.
- October 2026 · v2.19.1Engineering Toolkit printed reports include the brand line once, at the end of the written pages, before the drawing sheets: "UK electrical design. We make the tools and Revit content we use." A page is added for sizing another PD tool's tray runs; no PD tool uses it yet. Results for the same inputs and the free version are unchanged.
- October 2026 · v2.19.0The load check is Engineering Toolkit only. Tier bearers are counted at 2.6 kg/m: re-check drop rods, as one can be a size larger, or exceed M20 and FAIL. FP400, FP500 and FP600 are drawn as armoured and take On-Site Guide Table D1's longer armoured fixing spacings. Indicative safe working loads below 10 kg/m are shown to one decimal place.
- October 2026 · v2.18.0The tool is now PD Tray. Free use is one run at a time, on tier 1. Loads above the 3.0 m indicative safe working load are a FAIL at longer spans. Re-check side by side splits of three or more cable lines, or two single-core lines in trefoil: rod loads can be higher and drop rods one size larger.
- October 2026 · v2.17.1The printed report's top line names every run, and the bracket, needing action in Findings. Fill on the drawing sheets and in the tool includes any flange allowance. Fire-rated Trunking from My Projects takes its internal size. Widths, grouping factors and rods are unchanged for the same inputs; in reports saved before 2.17.1, re-check layouts, entered counts and 0% spares.
- October 2026 · v2.17.0Cables with no diameter or weight, baskets over 600 mm with no self-weight and spans over 3.0 m with no manufacturer's safe working load are not checked. Re-check split runs (lower or no grouping factor, larger rods unless stacked), bunched fills on tray (wider or OVER, rods larger or smaller) and single-core concentric cables (no factor). Cable weights are unchanged.
- October 2026 · v2.16.0The drawing headings read CROSS-SECTION, SECTION and LOADS; the sheet titles read CROSS-SECTION and SECTION. At any spare, including the default 25%, re-check these, which can be wider: medium and heavy duty trays with under 15 mm of width free; trefoil runs with spacing and two single cores left over; and split runs, where a tray could be narrower than its cables. Medium duty trays with 21 to 30 mm cables can be one size smaller, or one tray fewer. With more or fewer trays, a run's Grouping factor (Cg) can change. The cables' kg/m and Reference Method are unchanged.
- October 2026 · v2.15.0Single layer basket runs use wire mesh tray grouping factors, not perforated tray: most rise, three fall by 0.01 (two per basket). No factor is printed for more trays than Table 4C4 or 4C5 lists. With no spare, medium duty tray can now be one size larger where cables over 21 mm would sit under inward flanges. Re-check these cases.
- October 2026 · v2.14.0The Bracket elevation is now called Bracket loading. Grouping factors are no longer printed beyond the limits of BS 7671 Table 4C4 or Table 4C5: re-check cables sized with those factors before 2.14.0. In 2.13.1, the printed Cross-section of the screening room bracket showed rod B's size and "minimum" on separate lines; this is fixed. Otherwise the calculations are unchanged.
- October 2026 · v2.13.1On the drawing sheets, the Notes heading now has more space above it. In the Engineering Toolkit, a printed Notes column that would not fit above the Drawing data is now drawn 10 mm wider. The pictures in the exports show the same changes. The calculations and wording are unchanged in the tool, the printed report and the exports.
- September 2026 · v2.13.0The Bracket elevation is now a drawing sheet, like the cross-section. In the Engineering Toolkit it shows the run loads, rod loads and minimum drop rod size. Both sheets can print at the end of the report and appear in the Word and Excel exports. Before any cable is entered, a drawing marked SAMPLE is shown. The calculations are unchanged.
- September 2026 · v2.12.0The cross-section drawing is now a drawing sheet with callouts, notes, abbreviations and a key. In the Engineering Toolkit, the printed report can include the drawing on its own A4 landscape page with a run schedule. The Word and Excel exports include a picture of that page. The Specialist lighting and grouping lines were reworded. The calculations are unchanged.
- September 2026 · v2.11.0The cable list was moved to PD Cable Database, a separate plugin on projectdesign.io. The cables in the list, the calculations, the wording shown in the tool, the drawings, the printed report and the exports are unchanged. The same list is used, as before, in the Cable Duct, Conduit and Trunking tools, which are not changed in this release.
- September 2026 · v2.10.1A run of loaded circuits laid Bunched is now sized on its single layer width, so its tray can be wider or narrower: re-check trays sized before 2.10.1. Specialist lighting no longer counts as a loaded tier, so other runs on the same bracket can be given a grouping factor up to 0.06 higher, or one where none was printed because of the tier spacing, but no factor above 20 circuits on one tier. A cable not in the cable list is now kept as a Custom cable and named in a check line. Otherwise the calculations are unchanged.
- September 2026 · v2.10.0You can now duplicate runs and move cables between them. Above 20 circuits, a single layer on one tray is now given no grouping factor, as BS 7671 Table 4C1 gives none. Seven FP600 cables now match the current Prysmian FP600s datasheet. Otherwise the calculations are unchanged. Re-check cables sized before 2.9.2 on a run of loaded circuits laid Bunched.
- September 2026 · v2.9.3In the Engineering Toolkit, the printed report now includes the Sizing basis section and again states the safe working load (SWL) each run is checked against, and each run's support system line states its total load. The green, amber and grey are now darker, for the 4.5:1 text contrast that the Web Content Accessibility Guidelines 2.2 require at level AA. The calculations are unchanged.
- September 2026 · v2.9.2A run of loaded circuits with its Lay set to Bunched is now given the grouping factor of BS 7671 Table 4C1 item 1 for the circuits in its bunch; in 2.9.1 it was given a single layer factor, or none. Twelve lines citing a standard now use the verb of the clause they cite. Otherwise the calculations are unchanged.
- September 2026 · v2.9.1The simultaneous overload line now states the tabulated current-carrying capacity It, not Iz. The perforated tray definition is now cited to Appendix 4, 7.2, and the drawing caption and four other lines were corrected. The drawings now have the PD Power Distribution tool's colours and font, and the printed report has the same colours. The calculations are unchanged.
- September 2026 · v2.9.0The panels, buttons and input boxes, apart from the save and export panel, now have the PD Power Distribution tool's colours and font, and the tool name, version and Start again button are in a dark header bar. On a phone the page no longer scrolls sideways. The calculations, the check lines, the printed report and the exports are unchanged.
- September 2026 · v2.8.3The note citing BS 5839-1:2025 35.5 is now shown for fire alarm cables only. On trunking it states the clause's recommendation, a compartment reserved solely for the fire alarm cables; on tray, ladder or basket it states that the clause applies to conduit and trunking only, so a run of their own is good practice, not a requirement. The calculations are unchanged.
- September 2026 · v2.8.2One cable was added to the cable list: FP600S 5-core 35 mm², with an overall diameter of 39 mm and a weight of 3,300 kg/km from the current Prysmian FP600s datasheet. The calculations, the wording shown in the tool, the printed report and the exports are unchanged
- September 2026 · v2.8.1The list of typical arrangements now includes a sample dedicated life safety bracket for the primary supply, with FP600 power cables on a ladder and FP500 control cables on a tray above it. BS 8519 is applied when the sample is chosen, and the secondary supply is left for a separate route (BS 8519:2020 7.1). The calculations are unchanged.
- September 2026 · v2.8.0The Service list now includes "Life safety, primary supply" and "Life safety, secondary supply", and BS 8519 is applied to the bracket when either is chosen. A line in the tool now states when the two supplies share one bracket (BS 8519:2020 7.1) or life safety cables share a bracket with other services (7.3). The results for every other service are unchanged.
- September 2026 · v2.7.8The wording in the tool was revised in plain UK English: the Engineering Toolkit lines and the cable weight tip now say in the tool, and the segregation checks are called checks. The calculations, the printed report and the exports are unchanged
- September 2026 · v2.7.7The printed report is now laid out as a technical report, with text at 8 pt or larger and bracket drawing labels at 6.8 pt or larger. A one-line summary names each run that needs action and why, and every page is numbered. The calculations, the wording and the drawing in the tool, and the exports are unchanged.
- September 2026 · v2.7.6The notes written inside the program code were rewritten in plain UK English. The calculations, the wording shown in the tool, the printed report and the exports are unchanged
- September 2026 · v2.7.5The emergency lighting lines now cite BS 5266-1:2025 and say which wiring they apply to: the partition in shared containment (8.2.6) and the fire-resistant cable selection (8.2.2) apply to luminaires fed from a central power supply system; supply cables to self-contained emergency luminaires need not be fire-protected (8.1). No width, load, factor or rod value changed.
- September 2026 · v2.7.4On a BS 8519 fire route, the fire-resistant cable lines now say plainly what the category applies to on the bracket: the supports only, with the drop rods and the containment load checked for the fire survival time (120 min at Category 3). No width, load, factor or rod value changed
- September 2026 · v2.7.3The standards strip now reads "Standards applied", and its BS 8519 entry is the switch for the fire-rated route. On a BS 8519 route, the fire-resistant cables on every run are checked; fire alarm and emergency lighting cables are selected to BS 5839-1 and BS 5266-1, which BS 8519 does not cover. No width, load, factor or rod value changed.
- September 2026 · v2.7.2The tier spacing and the BS 8519 fire route now sit under Route options on the add-a-run panel. Where the worst rod exceeds the largest tabulated rod, the advice is now to reduce the bracket spacing or split the route: a trapeze bracket has two rods, so a third rod was never the remedy. No load, width or factor changed.
- September 2026 · v2.7.1Every numeric input now names the figure that could be entered by mistake: for example, the weight is kg per kilometre, not kg/m, and the support spacing is in metres, not the cleat spacing in mm. A weight that reads like kg/m and a support spacing above 6 m are flagged. No width, load, factor or rod value changed.
- September 2026 · v2.7.0Only the tiers with loaded circuits are now counted for grouping. The load check now names the duty chosen, or the manufacturer SWL when entered, and is an indicative check, never a compliance verdict. Tray runs now have a perforated or unperforated choice, with Reference Method C printed for unperforated tray. A blank spare, custom OD or weight is now asked for rather than taken as 0.
- September 2026 · v2.6.1The wording was revised in plain UK English: limited to replaces capped at, the manufacturer recommendation applies, the grouping factor line names the factor, and the cable picker labels use plain hyphens and the on-screen text has no dashes. No size or factor changed
- August 2026 · v2.6.0The recommended containment sizes stay in view in a bar that follows you down the page while you edit the runs. Drawing labels have a white background so they read clearly over the cables, and a review flag on a run reads as plain text rather than a dash
- August 2026 · v2.5.0Free use is now measured in sessions: three days of anonymous use, then your email continues free use with no password and no account. The applied grouping factor Cg per run is now free in the tool with its table reference. The report goes by email for free users, with print as part of the Engineering Toolkit.
- August 2026 · v2.4.3Subscriber-facing copy states what the Engineering Toolkit adds rather than what the free preview lacks
- August 2026 · v2.4.23-core 10 mm² SWA is now in the cable list, so the 3-core series runs 1.5 to 400 mm²; the 5-core 10, 70 and 95 mm² diameters and weights were corrected to the published dimensions tables
- August 2026 · v2.4.13-core 25 mm² SWA is now in the cable list, from the Eland Cables BS 5467 dimensions table
- July 2026 · v2.4.06491X PVC and 6491B LSZH singles are now in the cable list, 2.5 to 300 mm², for the CPC that runs with the distribution cables (Reg 521.10.1)
- July 2026 · v2.3.6Bunched runs state their usable depth in the run schedule, in the tool and in the report
- July 2026 · v2.3.5Trunking runs explain where they are included by reference
- July 2026 · v2.3.4The include-drawing tick now controls the printed PDF too, and every printed page gets 12 mm top and bottom margins
- July 2026 · v2.3.3Subscriber PDF prints at one font size and paginates naturally; the one-page squeeze stays on the free preview
- July 2026 · v2.3.2Report wording: BS 8519 reads N/A off a fire route, the stacked-tier note appears only on a stacked split, and a new tick marks the BS EN 61537 verification
- July 2026 · v2.3.1The drop-down list for picking a report from My Projects was widened to fill its row.
- July 2026 · v2.3.0Trunking runs can load a saved Trunking Size Calculator report: the W x D, the cable schedule and the verdict come across (Engineering Toolkit)
- July 2026 · v2.2.0Trunking runs have a 45% space factor fill check (OSG Appendix E), with a fill gauge and an OVER FILL verdict
- July 2026 · v2.1.5Claims audit against the standards: the Table 4C5 factor for 3 spaced trays of 3 circuits corrected from 0.89 to 0.86 (BS 7671 p.474)
- July 2026 · v2.1.4Bracket elevation draws a parallel split as separate trays with the 50 mm gap, matching the cross-section
- July 2026 · v2.1.3Default drop-rod centres now the widest tier plus 50 mm (25 mm clearance each side), so a 50 mm tray defaults to 100 mm centres
- July 2026 · v2.1.2A stacked split counts as real tiers: a bearer under every stacked tray, and both drawings show the stack
- July 2026 · v2.1.1Cross-section tier spacing is measured from the drawn runs, so bunched piles and deep upstands never overlap the tier above.
- July 2026 · v2.1.0Bunched lay for data, AV, specialist lighting and ELV runs (Excel Networking calculator method, EN 50174-2:2018 basis), with a depth input and pile drawing
- July 2026 · v2.0.26491B LSZH singles are now in the cable list for trunking runs; non-sheathed singles are not offered on open tray (Reg 521.10.1)
- July 2026 · v2.0.1The Lighting & power and Other services categories were added; the trunking self-weight is optional, with a built-in estimate when blank
- July 2026 · v2.0.0Multi-service redesign: runs arranged on the bracket by tier, with a bracket-wide support check
- July 2026 · v1.11.2Cleat design note covers mixed trays and updates as the fault current is typed
- July 2026 · v1.11.1A cleat-centres elevation was added to the fixing check
- July 2026 · v1.11.0The cable fixing spacings (OSG Table D1) and the BS EN 61914 fault-restraint check were added
- June 2026 · v1.10.3The free PDF was fixed so the page is no longer printed smaller because of the branding.
- June 2026 · v1.10.0BS 7671 grouping (derating) guidance and editable saved reports were added
- June 2026 · v1.9.0A BS 8519 fire-rated cable category advisory was added (FP200 to FP600)
- June 2026 · v1.1.0Rebuilt to BS 7671:2018+A4:2026 with a dynamic reference-method diagram