[Or] When a branch splits, one or more branches are activated. Before merging, all active incoming branches must be completed.[1]
Symbol
![Inclusive [Or] Gateway](https://projectdesign.io/wp-content/uploads/2024/03/Gateway-Or-300x300.webp)
1] Silver, B. (2009). BPMN Method and Style: A levels-based methodology for BPM process modeling and improvement using BPMN 2.0. In CodyCassidy Press US.