The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
interoperability
the ability of two or more systems* to exchange information and to use the information that has been exchanged. definition adapted from the one contained in ‘ISO/TS 27790:2009, Health informatics—
The Gemini Principles
Purpose: Must have clear purpose Public good Must be used to deliver genuine public benefit in perpetuity Value creation Must enable value creation and performance improvement Insight Must provide determinable

Information Interoperability
Information overload What makes construction management so challenging is the sheer amount of information available, the volume of the data means that we are often not able to extract or
Committee
This could be: a Technical Committee (TC), which develops standards in a certain sector or industry; a Subcommittee (SC), which addresses a specialized area within a TC; a Project Committee
Intermediate Event
An intermediate event is something that occurs between the beginning and end of a process. Triggers can be “caught” or “thrown” by intermediate events. [1] Symbol 1] Silver, B. (2009).
naming
The term naming in PAS 1192 is related to information container naming strategy, in ISO 19650 the therm is replaced by term ‘identification’ meaning remains the same
efficiency
correlation between the outcome and the resources used a measure of the utilization of resources to realize a given objective Note 1 to entry: An activity is efficient if it minimizes
Assignment matrix
Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192] The former is illustrated as
BS EN ISO 14004:2016
Environmental management systems General guidelines on implementation
Association Française de Normalisation (AFNOR)
Association Française de Normalisation Asociation French Normalization Organization Regulation

x-ref
The term “X-ref” is commonly used as an abbreviation for “External Reference” in various technical and engineering fields, including construction, Building Information Modeling (BIM), and computer-aided design (CAD). Here’s a
Contract
Appointment ISO 19650 introduce term Appointment to be used instead of the more generic term contract. This means one term can be used for both external contracts and internal work

Electrical Abbreviations & Acronyms Reference
Electrical Abbreviations & Acronyms Reference This table contains 377 commonly used electrical abbreviations and acronyms, covering everything from current ratings and protection devices to power systems and components.It’s designed to
domain
area of activity covering a science, a technique, a material, etc.Note 1 to entry: A domain can be associated with a group to which the property […] applies. BS EN

SPD Protection Device Ratings for Main Switchboards
SPD Protection Device Ratings for UK Main Switchboards: A Practical Guide Based on extensive research of UK standards, manufacturer specifications, and industry practices, here are practical “rule of thumb” protection
Message Flow
A message flow depicts the exchange of messages between two participants who are ready to send and receive them. A message flow must connect two distinct pools. They are either
enumerated type value
data type consisting of a set of named values called elements, members, enumeral, or enumerators ofthe type
delivery phase
part of the life cycle (3.2.10), during which an asset (3.2.8) is designed, constructed and commissioned [cited from ISO 19650-1:2018(en), 3.2.11] ISO 19650-2:2018 Standard dedicated to the delivery phase

Level of information need
Ever feel like you’re drowning in BIM data you don’t need, or scrambling for details that should’ve been there? Enter the concept of Level of Information Need. It’s a straightforward idea buried behind a not-so-straightforward name (looking at you, BS EN ISO 7817-1:2024). In plain English, a Level of Information Need defines exactly what information should be delivered – no more, no less – for a given BIM use case or project stage.
Z1
Z1 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the line conductor of the circuit under consideration.
definition
representation of a concept by a descriptive statement which serves to differentiate it from related concepts Note 1 to entry: A definition may be expressed as natural language text (a textual

PAS 1192 vs ISO 19650 terms
Quick reference guide In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison. PAS references (superseded) ISO References (current) Pre-contract BEP Pre-appointment BEP Post-contract
Target Value Design
Target Value Designs (TVD) focus is on reducing the cost of a project without reducing the quality of the end product or extending the timetable. The team sets a cost
Globally Unique Identifier (GUID)
globally unique identifier (GUID) its a unique object identifier that guarantees its uniqueness throughout its entire life unique, the identifier is usually generated using an algorithm a unique identifier generated
identification
The “identification” is ISO 19650 term equivalent to PAS 1192 term ‘naming’
security breach
infraction or violation of security (3.7) [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
Fixed Equipment
Equipment designed to be fastened to a support or other wise secured in a specific location.
SMART Information requirements
The acronym SMART has been defined by the PAS 1192‑2: 2013 clause 5.1.3. the term means that Information req BS ISO 31000:2018 PAS 11922: 2013 clause 5.1.3 defines the acronym
Certification
Assurance given by an independent certification body (ISO does not perform certification) that a product, service or system meets the requirements of a standard. https://www.iso.org/glossary.html
geometrical
This is an ISO 19650 term which replaces the PAS1192 term “graphical”. Geometrical is more appropriate to describe spatial positioning and relationships
Project BIM Coordinator
Responsible, during the design stages, for executing, managing and running clash detection of the federated Project Information Model (PIM), and federating and QA reviewing the Asset Information Model (AIM) for

The Level of and Progression Management systems
The ISO 19650 set of standards introduces a new term: ‘Level of information need’ which is designed to replace the terms used in BS EN 1192 such as Level of
Appointee
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN

SHARED
All project Model Authors’ information for the use of the entire project team. The Federated Model Manager will combine all information for checking against the AIR. All team members should
BS ISO 55002:2018
Asset management — Management systems Guidelines for the application of ISO 55001
Role
BIM roles are not necessarily related to specialist positions. It should be viewed as a function that could be fulfilled by more than one person and allow the transfer of

Document Naming Strategy
DOCUMENT NAMING STRATEGY All information in the PD Revit Template follows PROJECT DESIGN (IO) standards. the For one-page drawing naming strategy, please refer to free download E-5161 OnePage Naming Strategy

The importance of Information Requirements to a successful Asset Information Management (AIM) System
Introduction One of the challenges is the Appointing Party’s difficulties with the development of successful Operational Information Requirements in relation to asset management. Understanding the business challenges that define the
National BIM Standard
National BIM Standard (NBIMS) – United States Version 2 is sponsored by National Institute of Building Sciences (NIBS) under its BuildingSMART Alliance Council. [1] [1] The Massachusetts Port Authority, 2015.
Ground rating factor (Cc)
The rating factor Cc = 0.9 is applied to cable sizing calculations for cables installed in the ground (Installation Methods 70 to 73). See BS7671:2018,Appendix 4,Sections3,4 and 5.1.1.

metadata
ELI5-S1: BIM Basics E6: Metadata explained Understanding Metadata in Building Information Modeling (BIM) Metadata provides critical information about an item’s content, making it easier to locate and work with specific

The role of management in BIM implementation at a project and organisational level
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of dedicated BIM management role within

Problem Solving Process
Understanding the Problem-Solving Process
Effective problem-solving is at the heart of success in any field. Drawing inspiration from the book “General Relativity for Babies” by Chris Ferrie, which simplifies complex topics into easy-to-understand concepts, I have created a straightforward guide to the problem-solving process.
BIM collaboration format (BCF)
BIM Collaboration Format (BCF) is an open file format that allows the addition of textual comments, screenshots, and other information on top of the IFC model layer for improved communication
International Harmonized Stage Codes
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF
BS ISO 44001:2017
Collaborative business relationship management systems Requirements and framework
Co-Location
Assembling the entire BIM design and construction team in a single location (“Co-location”) enables almost instant and direct communication and coordination among team members. This Co-location of all team members

Please can you confirm if the life system system has to be lidded?
Please can you confirm if the life system system has to be lidded? There is no requirement for the life system to be lidded. A lid is effectively required
Semi-enclosed fuse rating factor (Cf)
The rating factor Cf = 0.725 is applied to cable sizing calculations for any circuit protected by a semi-enclosed fuse to BS3036.