The Ultimate BIM Knowledge Hub

Your one-stop resource for BIM electrical.
0 Total Posts
Blog
Jarek Wityk

Level of information need

Ever feel like you’re drowning in BIM data you don’t need, or scrambling for details that should’ve been there? Enter the concept of Level of Information Need. It’s a straightforward idea buried behind a not-so-straightforward name (looking at you, BS EN ISO 7817-1:2024). In plain English, a Level of Information Need defines exactly what information should be delivered – no more, no less – for a given BIM use case or project stage.

Read More »

UK BIM Framework

The UK BIM Framework was developed by the UK BIM Alliance, BSI, and the Centre for Digital Built Britain associated with the Construction Industry Council (CIC) to implement international BIM

Read More »

BS ISO 21500:2012

Guidance on project management ISO 21500 describes guidelines for managing projects and processes in project management, including standards, methods, and processes. The standard is intended to align with related international

Read More »
Blog
Jarek Wityk

Wiring in Protected Escape Route

Compliance with fire safety regulations in Firefighting Cores directly affects life safety and emergency response. This guide will help you meet the latest fire performance standards.

Read More »

Information Delivery Manual (IDM)

information delivery manual (IDM) Documentation that captures the business process and specifies in detail the information that a user performing a particular role is required to provide at a particular

Read More »

Cable k2s2

k2s2 its an Energy withstand of cable in A2s. For example,a cable with a withstand of 12 x 104 A2s, can sustain without permanentdamage,a fault current of 1,000 A for

Read More »

BIM Strategic Lead

Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM staff duties include: Development of

Read More »

Gateway (Exclusive)

[XOR] When splitting, directs the sequence flow to one of the outgoing branches. When merging, it waits for one incoming branch to finish before starting the outgoing flow.[1] Symbol   

Read More »

Insurance Backed Alliancing

A new procurement method coupled up with Integrated Project Insurance model (IPI) is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence

Read More »

Business goals

Business goals drive organisational outcomes, helping to keep the focus on the company’s important short and long term priorities. The goals must be defined, understood, tracked, analysed, and measured to

Read More »
Dictionary
Jarek Wityk

lead appointed party

The term introduced by ISO 19650 typically describes the Tier 1 Main Contractor. For example: : The Lead Appointed Party is a specific entity directly appointed (employed) by the primary

Read More »

Consumer Unit

Atype of single-phase board for the control and distribution of electrical energy, principally in domestic premises. In the ProDesign software,a consumer unit (CU) can be split into three sections,each with

Read More »

Lane

A lane is a sub-partition within a process (often within a pool) that runs the length of the process level, either vertically or horizontally. Lanes are frequently used for internal

Read More »

Trigger Event

Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for

Read More »
Blog
Jarek Wityk

How to respond to request for proposal (RFP)

Introduction It can be said that the digitalization of construction began with designers moving from drawing boards to computers. [1] In Architecture, Engineering, Construction and Operation (ACEO), the focus has

Read More »

cost plan

statement showing an apportionment of an estimate (3.7.9) or of an agreed budget between cost (3.7.1) headingsNote 1 to entry: For example, the cost plan might be broken down into building elements. [1] 1 Online Browsing Platform (OBP)

Read More »
Classification and Standardisation
Jarek Wityk

Complete information

adjective In Architecture Engineering and Construction (AEC), complete information is information which includes all the necessary and typical parts or elements, lacking nothing. For the information to be deemed complete,

Read More »
How To
Jarek Wityk

Mimic Panels for Life-Safety Generators

Mimic Panels for Life-Safety Generators – UK-Specific Designer’s Guide Key takeaway: Indicator for generators and smoke-control systems (commonly referred to as ‘mimic panel’, often marked “ESP – Emergency Stand-by Power

Read More »
Dictionary
Jarek Wityk

Task Information Delivery Plan (TIDP)

schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined by the ISO 19650 framework

Read More »

Look Ahead Plan

A short interval plan, based on the pull/phase plan, that identifies all the activities to be performed in the next 6 (or other) weeks. The 6W Look-Ahead Schedule (LAS) is

Read More »

Value

What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.

Read More »

efficiency

correlation between the outcome and the resources used a measure of the utilization of resources to realize a given objective Note 1 to entry: An activity is efficient if it minimizes

Read More »

Integrated Workplace Management System

Integrated Workplace Management System. Such systems incorporate powerful database capabilities to capture enterprise-level functions and serve as decision support tools at all organizational levels and throughout the whole building lifecycle.

Read More »

Budget

The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must incorporate the total amount of

Read More »

Model

An electronic, three-dimensional representation of built asset or facility elements with associated intelligentattribute data (“Facility Data”). A Model term used in PAS 1192 specification has been replaced by term ‘Information

Read More »

Employer’s Information Requirements (EIR)

The PAS 1192 term Employer Information Requirements (EIR) has been replaced by Exchange Information Requirements (EIR) on projects where ISO 19650 standards are applicable. Employer’s information requirements (EIR) also use

Read More »
How To
Jarek Wityk

COBie data drop

COBie data drop Individual COBie data drops are the responsibility of Task Team BIM Managers, who must upload the required information containers in accordance with Exchange Information Requirements (EIR).The COBie

Read More »

BIMwash

The term BIMwash is derived from Whitewash, “a cheap white paint or coating of chalked lime used to quickly give a uniform clean appearance to a wide variety of surfaces”. Metaphorically, to

Read More »

Project BIM Manager

Responsible for ensuring that the BIM workflow has been established for the project and is adhered to by the team during the implementation stages of the project.  [Appointment: Lead Appointed

Read More »

Resources

In the context of project management, the resources refer to optimizing the use of resources for successful project execution and the management of resources in the project. [1] Therefore, the

Read More »

Conformance Class

Conformance class allows establishing relations from the information model of BS EN 82045-2 to any other object of relevance available information model. For example, the Project Information Model (PIM) Conformance

Read More »

Appointing party

Appointing party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Employer’ ISO 19650 term depends on where in the hierarchy the employer is

Read More »

Industry Foundation Classes (IFC)

conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is a standardized, digital description of

Read More »

NWC

NWC is a cache file. “When you open a CAD file in Navisworks, by default, a corresponding cache file (NWC) is created, which contains all of the conversion details required

Read More »
Dictionary
Jarek Wityk

BIM

Building Information Modelling (BIM)[1] broadly describes the processes employed during digital information management related to a built asset such as a building, bridge, highway or tunnel. ISO 19650 outlines a

Read More »

Project Information Standards

Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards         In line with BIM Goals and Uses to ensure continuity that information containers are structured, coordinated, managed

Read More »

Plain Language Questions (PLQ)

The publication of ISO 19650 set of standards replaces use of PLQ and instead introduce the term with exchange information requirements (EIR) and project information requirements (PIR). Project information requirements

Read More »
Dictionary
Jarek Wityk

information container

ELI5-S1 BIM Basics E12_Information Container explained A persistent set of information retrievable from within a file, system, or application storage hierarchy. [1] named persistent set of information retrievable from within

Read More »