The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5

Insurance Backed Alliancing projects under the IPI model
Introduction Martin Davis member of the New Models of Construction Procurement (NMCP) Working Group and the Integrated Project Insurance (IPI) mentor describes the Integrated Project Insurance model (IPI) coupled up
Employer
Appointing party ISO 19650 term depends on where in the hierarchy the employer is located.The BS EN ISO 19650‑2 appointing party (A) is the equivalent of the PAS 1192‑2:2013 top‑level
trigger event
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]
Circuit Protective Conductor (CPC)
Acircuit protective conductor (CPC) connects exposed-conductive-parts* of equipment to themain earthing terminal. *Conductive part of equipment,which can be touched and which is not normally live,but which can become live when
Device rating (In)
Circuit Protective Device rating,or ‘In’ in Amperes. If the overload setting can be adjusted, then the ‘adjusted rating’ is known as ‘Ir’.
Team’s Capability and Capacity
The competence and understanding of BIM, of the consultants and delivery team partners to be involved in the project, shall be assessed and results included in Post-Contract BEP. The assessment
Project Information Standards
Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards In line with BIM Goals and Uses to ensure continuity that information containers are structured, coordinated, managed
SMART Information requirements
The acronym SMART has been defined by the PAS 1192‑2: 2013 clause 5.1.3. the term means that Information req BS ISO 31000:2018 PAS 11922: 2013 clause 5.1.3 defines the acronym
information
reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]

Navigating Construction Projects with Incomplete Building Services Design: Real-world Solutions Wanted 🛠️
Here is my list of reasons why so often we have incomplete Building Services Design before the project starts construction: Incomplete Building Services Design (BSD) before the commencement of construction
Clash Detection
Clash detection, coordination analysis and data checks shall be carried out by the BIM Coordinators against the latest shared models. The workflows involve a combination of visual and automated checks
DWG
DWG (“drawing format”) is a binary file format licensed by Autodesk and used for storing two and limited three-dimensional design data and metadata. It is the native format for several

Emergency Lighting Standards and Regulations
BS 5266‑1:2025 – whats changed? Status & scope. The new edition was published on 29th and came into effect on 31 October 2025, withdrawing BS 5266-1:2016. It is intended to be
smart asset management
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the

Task Information Delivery Plan (TIDP)
schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined by the ISO 19650 framework
Lean Project Delivery System
An organized implementation of Lean Principles and Tools combined to allow a team to operate in unison.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a
ubiquitous access
The modern era of IT has turned to ubiquitous access to all organizations and users. The vision is to provide one “universal access,” i.e. access to all IT services, regardless
System of systems
A system of systems is a collection of many different systems, each with its own characteristics. [1] System theory assumes that certain underlying concepts and principles are applicable to different
Fabrication Model
Digital Model(s) created from shop drawings to support fabrication and installation. Fabrication models are reviewed and approved by the A/E for conformance to design specifications.1 1 The Massachusetts Port Authority,
verification
confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service meets the specification, it will

BS ISO 55000:2014
Asset management Overview principles and terminology The ISO 55000 standard integrates with other essential management systems by outlining definitions and terminologies for asset management. Published under the International Organization for

information delivery milestone
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery milestone is a point in
Employer’s Information Requirements (EIR)
The PAS 1192 term Employer Information Requirements (EIR) has been replaced by Exchange Information Requirements (EIR) on projects where ISO 19650 standards are applicable. Employer’s information requirements (EIR) also use
promotor
algorithm that generates an interaction schema from an interaction framework, interaction framework schema, and templates file as input [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed

information container
ELI5-S1 BIM Basics E12_Information Container explained A persistent set of information retrievable from within a file, system, or application storage hierarchy. [1] named persistent set of information retrievable from within
Depth of lay rating Factor (Cd)
The rating factor Cd is applied to cable sizing calculations for cable installed in the ground. Its value varies according to the depth of lay installed. See BS7671:2018,Table4B4. Indicates the

BS8519 awareness of the changes
An email debate on whether BS 8519’s “dedicated cable support” rules really apply to central battery emergency lighting. We unpack the scope of BS 8519 vs BS 5266-1 and BS 7671, and what that means for segregation, containment and life-safety wiring on real projects.

single source of truth
In AEC industry with reference to information systems management, the single source of truth refers to Common Data Environment (CDE) The single source of truth is a method of structuring
diffusion
a process by which an innovation is communicated through certain channels over time among the members of a social system E.M. Rogers, Diffusion of Innovations, Free Press, New York, 1995.
Contract
Appointment ISO 19650 introduce term Appointment to be used instead of the more generic term contract. This means one term can be used for both external contracts and internal work
TT system
A system having one point of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to earth electrodes electrically independent of the earth electrodes of the

Delivery Team context of information exchange
ELI5-S2 BIM in Practice E3 Delivery Team context of information exchange ELI5-S2: BIM in Practice E3: Delivery Team context of information exchange explained Understanding the context of information exchange from
minor change
change that does not affect the meaning, function or intended use NOTE 1 Definition applies to properties and groups of properties.NOTE 2 Examples of this type of change are new

HVO Fuel
Hydrotreated Vegetable Oil (HVO) is a renewable, diesel-type fuel made from vegetable oils and fats instead of crude oil.
Start Event
A start event specifies where a process will begin. Start events can only react when a trigger is “caught.” Symbol 9). BPMN Method and Style: A levels-based methodology for BPM
Integrated Digital Delivery
History History’s Professor, Yuval Noah Harari, in his book Homo Sapiens reached a conclusion that humans developed an ability to transmit information about things that do not really exist (stories),
built asset
individual or multiple buildings (e.g. a site or campus) or infrastructure (e.g. roads, railways, pipelines, dams, docks, etc.) built as part of a construction project or where the asset information
Master Schedule
The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first

Comparison of ISO 19650 Part 2 and 3
Workflow comparison First, I constructed an information exchange process diagram based on ISO 19650 Part 2 dedicated to the delivery phase of an asset lifecycle (project delivery). Next, I have
Quantity Surveyor (QS)
person who provides financial and contractual advice and services for planning, carrying out and completion (3.5.23) of construction works https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25
Code of Conduct
Set of principles to be followed by people involved in ISO work, e.g. working within an international framework, upholding consensus, being ethical. https://www.iso.org/glossary.html
task team
The term, introduced by ISO 19650, describes a team of people working together on a specific task. task team might be an individual appointed party, and the appointed party might
acceptance criteria
evidence required for considering that requirements have been fulfilled [cited from ISO 19650-2:2018(en), 3.1.1.1] Information issued via the Common Data Environment (CDE) must comply with Project Information Requirements (PIR) outlined
Sequence Flow (Normal or Uncontrolled)
A sequence flow is used to show the order in which activities in a process or choreography will be performed.[1] Symbol 1] Silver, B. (2009). BPMN Method and Style: A
Target Value Design
Target Value Designs (TVD) focus is on reducing the cost of a project without reducing the quality of the end product or extending the timetable. The team sets a cost
Working Group (WG)
WORKING GROUP (WG) Specialized group within a committee that is responsible for drafting a particular standard or set of deliverables. It is usually quite small, composed of experts and headed by
Construction Manager at Risk
Various key characteristics of CM@Risk include: there are separate contracts for design services and for construction services; the contract for construction services may be entered into at the same time