The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5

Force Relinquish
Tip of the Day (TOD): How to Relinquish Locked Revit Models If you’ve ever been frustrated by locked Revit model elements when a team member is unavailable to relinquish them,
Budget
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must incorporate the total amount of
risk register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
Gateway (Parallel)
[And] When used to split the sequence flow, all outgoing branches are activated at the same time. When parallel branches are merged, it waits for all incoming branches to complete

Document Naming Strategy
DOCUMENT NAMING STRATEGY All information in the PD Revit Template follows PROJECT DESIGN (IO) standards. the For one-page drawing naming strategy, please refer to free download E-5161 OnePage Naming Strategy
validation
confirmation, through the provision of objective evidence, that the requirements for a specific intendeduse or application have been fulfilled [SOURCE: BS EN 17412‑1:2020] For example, it is the process of
BS EN ISO 12006-2:2020
Building construction – Organization of information about construction works Part 2: Framework for classification
Open Data
The Open Data Institute (ODI) defines open data as information that is licensed for anyone to use for any purpose at no cost. Open data can be accessed, used and
Leadership in Energy and Environmental Design
An internationally recognized green building certification system confirms the level of the sustainability performance of an asset. Confirming the level at which the asset was designed and built using strategies
ubiquitous access
The modern era of IT has turned to ubiquitous access to all organizations and users. The vision is to provide one “universal access,” i.e. access to all IT services, regardless
Resources
In the context of project management, the resources refer to optimizing the use of resources for successful project execution and the management of resources in the project. [1] Therefore, the
Start Event
A start event specifies where a process will begin. Start events can only react when a trigger is “caught.” Symbol 9). BPMN Method and Style: A levels-based methodology for BPM
Virtual Design and Construction
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time, cost, and ensure design intent.
Plain Language Questions (PLQ)
The publication of ISO 19650 set of standards replaces use of PLQ and instead introduce the term with exchange information requirements (EIR) and project information requirements (PIR). Project information requirements
identification
The “identification” is ISO 19650 term equivalent to PAS 1192 term ‘naming’
specialization relation
relation between kinds of things that relates two concepts whereby the subtype concept is a more specific concept than the supertype concept and has all the aspects that define the
expert
person who, through knowledge or experience, has competence to give an opinion in the fields about which he/she is consulted[SOURCE: ISO 13302:2003, 3.10, modified — The domain “” has been
Commissioning
A building has successfully gone through the commissioning process when its equipment and systems have been examined and tested to perform as designed, and its operators have been trained to

Project Team
All parties appointed for the project are defined as members of the Project Team. Each function can be fulfilled by either an individual or multiple people throughout the course of
Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a
interoperability
the ability of two or more systems* to exchange information and to use the information that has been exchanged. definition adapted from the one contained in ‘ISO/TS 27790:2009, Health informatics—

LTF_Lighting-Fixture Ring
Create unlimited lighting variations with parametric control.
The PD_LTF_Lighting-Fixture_Luminaire-Ring Family is a powerful, fully parametric Revit family that allows users to create limitless lighting fixture configurations.

Level of information need
Ever feel like you’re drowning in BIM data you don’t need, or scrambling for details that should’ve been there? Enter the concept of Level of Information Need. It’s a straightforward idea buried behind a not-so-straightforward name (looking at you, BS EN ISO 7817-1:2024). In plain English, a Level of Information Need defines exactly what information should be delivered – no more, no less – for a given BIM use case or project stage.
Rating factors
Rating factors are divided into the nominal rating of the circuit protective device (In) to determine theminimum current-carrying capacity (Iz) of a cable in a circuit. For example:Iz = In/(Ca
UK National Annex 2021 Discipline vs Role
The field ‘Role’ has been renamed ‘Discipline’ in the most recent edition of BS EN ISO-2 19650-2:2018 NA February 2021. The previously used role codes, derived from BS 1192:2007, had
Spacial Asset
A spacial asset can be defined as a specific location such as a zone, boundary, area, floor or room with a known location and extents.For most businesses, spacial assets usually
Architecture, Engineering and Construction (AEC) integration with Industry 4.0
The meaning of the term Industry 4.0 has not been concluded. There is a level of ambiguity of what it means for the construction industry[1] According to Jim Mansfield,
BS ISO 21500:2012
Guidance on project management ISO 21500 describes guidelines for managing projects and processes in project management, including standards, methods, and processes. The standard is intended to align with related international
Geographic Information System (GIS)
A geographic information system (GIS) is a framework for gathering, managing, and analyzing data. Rooted in the science of geography, GIS integrates many types of data. It analyzes spatial location
component
named and individually scheduled physical item and feature that might require management, such as inspection, maintenance, servicing or replacement, during the in-use phaseNote 1 to entry: Components can serve as
Project delivery team
In respect of asset lifetime PAS 1192-2:2013, describes one project delivery team, the term is connected with word ‘contract’ meaning one or many companies or individuals employed either directly or

Domestic PV sizing rule-of-thumb (RoT)
Domestic PV sizing rule-of-thumb (RoT) Grid-tied, focused on self-consumption UK rule-of-thumb (RoT) Peak Sun Hours (PSH): 3.5 summer, 2.0 spring/autumn, 1.0 winter For calc use Peak Sun Hours (PSH) =
Equipment Clearance
Equipment Clearance shall be modelled for use in interference management and maintenance access requirements. It is the minimum space adjacent to the equipment required to allow access for maintenance, installation

Archive
History of project information, such that any non-current published information in the published area should move into this area. New parties to the project will receive an invitation to join
BS ISO 44002:2019
Collaborative business relationship management systems Guidelines on the implementation of ISO 44001
BS EN ISO 23386:2020
Building information modelling and other digital processes used in construction Methodology to describe, author and maintain properties in interconnected data dictionaries
BS ISO 22263:2008
Organization of information about construction works Framework for management of project information

LTF_Lighting-Fixture Circular
LTF_Lighting-Fixture_Luminaire-Circular vv22.1.1. Family For: Electrical Engineers, Bim Managers, Electrical Designers Setup: 10 – 30 minutes View Details ▼ Technical Details Released: Feb 9, 2025 Updated: Jul 5, 2025 Compatibility Notes:
attribute
Depending on the technology discussed, the term attribute can be treated as equivalent to a property or as a set of attributes, such as the number of elements in a
IDM standard
BS EN ISO 29481-1 Building information models – Information delivery manual (IDM) PD ISO/TS 12911:201

Secondary Supply – diverse cable route
This guidance covers the routing of secondary supply cables from a life safety generator to the ATS (Automatic Transfer Switch), and the final equipment with reference to:
BS 7671:2018+A2:2022, specifically Section 560: Safety Services
BS 8519:2020, with emphasis on Clause 7 (Cable Routing) and Clause 11 (Cable Selection)
The goal: clarify requirements for the diverse cable routing and maintain circuit integrity under fire conditions for systems that support life safety and fire-fighting applications, such as sprinkler pumps, fire-fighting lifts, and smoke control systems.
BS EN ISO 21597-2:2020
Information container for linked document delivery. Exchange specification. Link types

information delivery milestone
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery milestone is a point in
Message Flow
A message flow depicts the exchange of messages between two participants who are ready to send and receive them. A message flow must connect two distinct pools. They are either
Target Value Design
Target Value Designs (TVD) focus is on reducing the cost of a project without reducing the quality of the end product or extending the timetable. The team sets a cost
Clash Detection
Clash detection, coordination analysis and data checks shall be carried out by the BIM Coordinators against the latest shared models. The workflows involve a combination of visual and automated checks
reference document
publication that is consulted to find specific information, particularly in a technical or scientific domain EXAMPLE See EN 771-1:2011+A1: 2015.Note 1 to entry: A reference document can be associated with

data
ELI5-S1 BIM Basics E18_data Understanding Data in BIM: The Foundation of Smart Asset Management When we think about Building Information Modeling (BIM), it’s easy to get lost in the complexity