The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
BS 7000-4:2013
Design management systemsPart 4: Guide to managing design in construction
BS 8541-3:2012
Library objects for architecture, engineering and construction Part 3: Shape and measurement – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede BS 8541, parts 1-6.
Fixed Equipment
Equipment designed to be fastened to a support or other wise secured in a specific location.
Soil Thermal Resistivity
Relates to the ability of the soil, in which the cable is installed, to conduct heat energy away from the cable. The rating factor Cs is applied in cable sizing
Sub-Process (Expanded)
The sub-process boundary is expanded, and the details (a process) are visible within it. It is important to note that sequence flows cannot cross the boundary of a sub-process.[1] Symbol
BS EN ISO 19650-3:2020
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling Part 3: Operational phase of the assets
Activity (Task)
A task is an atomic activity that is part of a process. When the work in the process is not broken down to a finer level of process detail, a

BS EN ISO 31000:2018
Risk management guidelines ISO 31000 is an international standard first published in 2009, the current version published in 2018. The standard contains principles and guidelines for effective risk management. It
Globally Unique Identifier (GUID)
globally unique identifier (GUID) its a unique object identifier that guarantees its uniqueness throughout its entire life unique, the identifier is usually generated using an algorithm a unique identifier generated

Organizational Information Requirements (OIR)
ELI5-S1: BIM Basics E7: OIR explained information requirements in relation to organizational objectives BS EN ISO 19650‑1:2018 (3.3.3)
workflow management system
Workflow management systems allow organisations to identify and control activities associated with a business process. Effective workflow management offers the opportunity to measure and analyse the execution of the processes
As-Built Model
Model(s) based on Fabrication Shop Model(s) and installed conditions.1 1 1 The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Competent person
Aperson who possesses sufficient technical knowledge, relevant practical skills and experience for the nature of the electrical work undertaken and is able at all times to prevent danger and,where appropriate,
Working Group (WG)
WORKING GROUP (WG) Specialized group within a committee that is responsible for drafting a particular standard or set of deliverables. It is usually quite small, composed of experts and headed by
Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for
Permitted Purpose
A submittal state defining the intent or suitability. Permitted Purpose means any purpose related to the Works (and/or (without limitation) the construction, refurbishment, extension, operation, management and/or maintenance of the

Organisational capability
Potential and expertise suggesting ability. Capability implies an organisation’s capacity to engage in a range of constructive activities Organisational capability is also referred to as organisational competence, although a capability refers to the
Harmonic
The presence of harmonic content in the line conductors of a three-phase and neutral circuit can give rise to excessive levels of load current in the neutral conductor.
workflow
The term ‘workflow’ is used in ISO 19650 instead of the PAS 1192 term ‘process’.
Model Production Delivery Table (MPDT)
An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail. The recent publication of ISO 19650 standards does not include
Budget
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must incorporate the total amount of
Specialist BIM Manager / Coordinator
The Specialist BIM Coordinator duties will reflect those for the Project BIM Coordinator but will be specific for discipline or trade-specific models and data deliverables. Responsible for checking, reviewing and

Psychological attributes of collaborative working
The psychology of workplace collaboration can be traced back to the everyday interactions that occur in any organization. In the fast-evolving business world, there is a rising need to move
Project Implementation Plan (PIP)
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists of the supplier’s: BIM assessment
UML diagram
provides the data structure for data templates using objects, collections and relationships between them. The multiplicities in the UML diagram specify the range of allowablecardinality values, giving a specification of
Set-Based Design
Set-Based Design commonly referred to as a set-based design innovation or set-based concurrent engineering. It is a product development approach where teams consider a wide range of design alternatives (a
Project delivery team
In respect of asset lifetime PAS 1192-2:2013, describes one project delivery team, the term is connected with word ‘contract’ meaning one or many companies or individuals employed either directly or
Royal Institute of British Architects (RIBA)
RIBA Plan Of Work 2020 0 – Strategic Definition is about determining the best means of achieving the client’s requirements. An open mind is required because a building might not
Crown Commercial Services (CCS)
The Crown Commercial Service (CCS) is an administrative agency and trading fund of the Cabinet Office of the UK Government, responsible for the supervision of the procurement of common goods
EXPRESS specification
formal specification is provided in the EXPRESS language. BS EN ISO 23387:2020
security
state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]
information
reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]

Secondary Supply – diverse cable route
Life Safety Secondary Supply Routing: Technical Compliance with BS 7671 and BS 8519 Background and Scope This guidance covers the routing of secondary supply cables from a life safety generator

Digital Plan Of Work (DPoW)
Digital Plan Of Work (DPoW) forms a framework that supports informed and consistent decision making by project teams, at each work stage, helping to deliver agreed and reliable information. The
Product Data Definition
A Product Data Definition (PDD) document intended to provide a consistent methodology for the definition, creation, management and sharing of product information throughout the life cycle of an asset, based
Supporting Information
Supporting information shall be used where applicable and relevant to fully understand and evaluate information requirements or acceptance criteria. Supporting information includes but is not limited to: Existing site surveys
Device rating (In)
Circuit Protective Device rating,or ‘In’ in Amperes. If the overload setting can be adjusted, then the ‘adjusted rating’ is known as ‘Ir’.

Organizational Drivers
ELI5-S1: BIM Basics E14: Organizational Driver Understanding the Organizational Driver in BIM Information Exchange In this post, we introduce a new term: the Organizational Driver, based on observations from my
tension between hope and ambiguity
term coined by Deloitte[1], it is a current situation where whilst businesses conceptually understand the significant changes that information Management (IM) and technology may bring, they have divergent agendas and
Openness
in relation to data and information – also linked to interoperability means that it is provided or made available in a format that can be accessed and used withoutrecourse to

Operational Team Context of Information Exchange
ELI5-S2: BIM in Practice E2: Operational Team Context of Information Exchange Explained In any BIM project, understanding the context of information exchange during the operational phase is crucial. This post
BS ISO IEC 33020:2019
Information technology—Process assessment Process measurement framework for assessment of process capability
Information Maturity
a current state of development of an organisation to utilise information in an advanced strategic manner to increase productivity, measured against an assumed optimal state
deactivation request
A deactivation request corresponds to a modification of the property. After validating of the deactivation request by the experts, the value of the calculated status of the property changes to

Life Safety Generator
Life Safety Generator selection guide Copy If the secondary power supply is provided for firefighter’s lift, it must be capable of operating the firefighter’s lift at its full rated load
unit
standard measurements of physical quantities that require a clear definition to be useful. The International Bureau of Weights and Measures (BIPM) is responsible for ensuring the standardization of the use
Virtual Design and Construction
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time, cost, and ensure design intent.