The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5

Emergency Voice Communication System (EVCS)
What is an Emergency Voice Communication (EVC) system? An Emergency Voice Communication (EVC) system (also referred to as EVCS) is a fixed, monitored, two-way voice communication system that enables point-to-point
agent
…’An agent is just something that acts (agent comes from the Latin agree, to do). Of course, all computer programs do something, but computer agents are expected to do more:
verification
confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service meets the specification, it will

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
Project delivery team
In respect of asset lifetime PAS 1192-2:2013, describes one project delivery team, the term is connected with word ‘contract’ meaning one or many companies or individuals employed either directly or
intrinsic aspect
role that an aspect plays in a relationship with a possessor and that is dependent on the aspect as well as on the possessing object Note 1 to entry: Typically the
major change
change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020
Prospective fault current (Ipf)
Prospective Fault Current (Ipf) is the value of overcurrent at a given point in a circuit resulting from a fault of negligible impedance between live conductors having a difference of

CDE state
ELI5-S1: BIM Basics E5: CDE areas and states This term replaces the ‘CDE area’ PAS 1192 term, the idea is the location of the information (container) is not important but
Appointed party
The appointed party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Supplier’ Typically it means Tier 2 and below Contractors Who can become
Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for
Project Information Standards
Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards In line with BIM Goals and Uses to ensure continuity that information containers are structured, coordinated, managed
BIM STRATEGY
a plan of action designed to achieve a long-term or overall aim. Definitions from Oxford Languages Required to define and understand what your company is trying to achieve with BIM.
Assignment
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for
Ambient temperature rating factor (Ca)
Ambient temperature rating factor used for calculating theminimum required cable size. For cables installed in air, values for this factor are given in BS7671:2018 Table4B1.For ground installations, values are given

The importance of Information Requirements to a successful Asset Information Management (AIM) System
Introduction One of the challenges is the Appointing Party’s difficulties with the development of successful Operational Information Requirements in relation to asset management. Understanding the business challenges that define the
racetrack
Information delivery cycle It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project and asset
EXPRESS specification
formal specification is provided in the EXPRESS language. BS EN ISO 23387:2020
Facility management (FM)
Facility management (FM) is an organizational function that integrates people and processes within the built environment to improve the functionality, comfort, safety, and efficiency of the core business.

Project Template_RVT_2024
Revit Electrical Project Template 2024 v24.1.1 Template For: Electrical Engineers, Bim Managers, Electrical Designers Setup: Typically 2–4 hours — quicker for experienced users. View Details Technical Details Released: Jul 24,
Project Information Manager
Responsible for extraction, review, coordination and reporting of data within the native and federated models as well as associated project databases throughout the project stages to ensure client and BEP

LTF_Lighting-Fixture Circular
LTF_Lighting-Fixture_Luminaire-Circular vv22.1.1. Family For: Electrical Engineers, Bim Managers, Electrical Designers Setup: 10 – 30 minutes View Details ▼ Technical Details Released: Feb 9, 2025 Updated: Jul 5, 2025 Compatibility Notes:
Royal Institute of British Architects (RIBA)
RIBA Plan Of Work 2020 0 – Strategic Definition is about determining the best means of achieving the client’s requirements. An open mind is required because a building might not
Fixed Equipment
Equipment designed to be fastened to a support or other wise secured in a specific location.
Conformity Assessment Committee (CASCO)
Committee whose secretariat is provided by ISO/CS that deals with conformity assessment and is responsible for the development of conformity assessment standards. https://www.iso.org/glossary.html
Project Implementation Plan (PIP)
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists of the supplier’s: BIM assessment

Project Template_RVT_2022
Revit Electrical Project Template 2022 v22.2.1 Template For: Electrical Engineers, Bim Managers, Electrical Designers Setup: Typically 2–4 hours — quicker for experienced users. View Details Technical Details Released: Apr 29,

BS ISO 8000-2:2020
Data quality Part 2: Vocabulary ISO 8000 is an emerging technology standard for organizations that want to improve business processes and control operating costs throughout the product life cycle from
Work stages
A division of standardised process and activities into named stages during the life of a system or facility. The process and activities extending from the definition of its requirements to
Intermediate Event
An intermediate event is something that occurs between the beginning and end of a process. Triggers can be “caught” or “thrown” by intermediate events. [1] Symbol 1] Silver, B. (2009).
Certification
Assurance given by an independent certification body (ISO does not perform certification) that a product, service or system meets the requirements of a standard. https://www.iso.org/glossary.html
The Centre for Digital Built Britain
The Centre for Digital Built Britain (CDBB) CDBB is a partnership between the University of Cambridge and The Department for Business, Energy and Industrial Strategy (BEIS). It is the custodian
Intermediate Event (Link/Throwing) Gateway
A gateway is a device that controls the divergence and convergence of sequence flows in a process or choreography. As a result, it will determine path branching, forking, merging, and
Sequence Flow (Normal or Uncontrolled)
A sequence flow is used to show the order in which activities in a process or choreography will be performed.[1] Symbol 1] Silver, B. (2009). BPMN Method and Style: A
BS EN ISO 19650-1:2018
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 1: Concepts and principles
Lean construction
Lean Construction is the method of project management aiming to reduce waste on a project and improving the efficiency and quality of produced work [1]. The aim to reduce overproduction,
trigger event
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]
Infrastructure
the structures that emphasize, organise and enable social functions. Individual units of infrastructure are known as assets. It is sometimes subcategorised into economic infrastructure, the networks of built assets that

zone indicator
part of indicating equipment which visually indicates the zone of origin of a alarm of fire or faultwarning BS 4422 2005 Zone Indicator in Fire Alarm Systems The zone indicator
Role
BIM roles are not necessarily related to specialist positions. It should be viewed as a function that could be fulfilled by more than one person and allow the transfer of

Comparison of status codes between UK National Annex (NA) 2018 vs UK NA 2021
# BS EN ISO 19650-2 2018 BS EN ISO 19650-2 2018, NA 02/2021 # Status Code Suitability Action by Suitability Action by Information State (at any project stage): Work in
taxonomy
A system for naming and organizing a set of words or phrases, into groups that share similar qualities, used for organising information and primarily intended for browsing. In BIM contexts
Diversity
It is often not desirable to size each conductor in a distribution system to support the total connected load at that point in the network.Diversity is applied on the basis
security breach
infraction or violation of security (3.7) [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
Quality Planning (QP)
Quality Planning (QP) is a framework which specifies quality standards, practices, resources, and the sequence of activities The quality plan should define:[1] Objectives to be achieved A workflow that represents

Quality Control
Quality control indicates an operational activity within the process, while quality assurance focuses on constructing confidence that quality requirements will be met. Quality is incorporated into production and verified during

PAS 1192 vs ISO 19650 terms
Quick reference guide In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison. PAS references (superseded) ISO References (current) Pre-contract BEP Pre-appointment BEP Post-contract
PAS 14191:2020
Built environment – Management and operation of interconnected construction data dictionaries Specification
security
state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]
buildingSMART Data Dictionary
PD 19650‑0:2019 In short, the BuildingSMART Data Dictionary is a library for everything to do with the building. NumberName is an int key and string value that can be stored