The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
carbon sink
A carbon sink is a natural or artificial reservoir that captures and stores morecarbon than it releases. Examples include forests, oceans, soil and potentially timber buildings. We need these reservoirs

Appointing Party context of information exchange
ELI5-S2: BIM in Practice E4: Appointing Party context of information exchange Understanding the Appointing Party (T0) Context of Information Exchange in BIM Welcome to the fourth installment of our ELI5-S2

BIM Stages
ELI5-S1:BIM Basics: E13_Understanding BIM Stages Understanding BIM Stages: Transitioning from BIM Levels to a Modern Framework In the world of Building Information Modeling (BIM), we often come across terms like
Portable document format (PDF)
It’s a versatile file format developed by Adobe that allows people to easily present and exchange documents – regardless of the software, hardware, or operating systems used by anyone who
Unified Modelling Language (UML)
language to provide system (3.13) architects, software engineers, and software developers with toolsfor analysis, design, and implementation of software-based systems as well as for modelling businessand similar processesNote 1 to
Commissioning
A building has successfully gone through the commissioning process when its equipment and systems have been examined and tested to perform as designed, and its operators have been trained to

coordination
Coordination goes beyond orderly task execution, it transforms individual perspectives into shared, community-wide actions. It’s not just a subset of collaboration; it’s the engine that makes collaboration more than a patchwork of solo efforts.
pre-design process
construction process (3.3.2) determining construction properties (3.5.1) for the built environment (3.1.7) before it is designed[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
Work stages
A division of standardised process and activities into named stages during the life of a system or facility. The process and activities extending from the definition of its requirements to
Final Circuit
A circuit connected directly to current-using equipment, or to a socket-outlets or other outlet points for the connection of such equipment.
NWD
NWD designates the published version of a Navisworks file with all loaded models, viewpoints, redlines, and comments saved to a single file. This file type can be opened with any

Emergency Lighting in Toilet Cubicles
Summary
1. If the toilet has borrowed light and is less than 8m square:
a. There is no need for emergency lighting, however,
b. If there is a cubicle with full height door – therefore closed without borrowed lighting – then the EM lighting would be required in that cubicle.
2. If the overall toilet has no borrowed light,
a. And the WC cubicles do not have full-size doors; there should be at least one emergency outside row of cubicles.
b. If there is a cubicle with full height door – therefore closed without borrowed lighting – then the EM lighting would be required in that cubicle.
BS EN ISO 21597-2:2020
Information container for linked document delivery. Exchange specification. Link types
Ambient temperature
The temperature of the free air surrounding a cable,or in the case of cables installed in the ground, the temperature of the surrounding soil.For an enclosed method such as ‘In
BS 8541-4:2012
Library objects for architecture, engineering and construction Part 4: Attributes for specification and assessment – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede BS 8541,
exchange requirement (ER)
defined set of information units that needs to be exchanged to support a particular business requirementat a particular process phase (or phases)/stage (or stages) BS EN ISO 29481-1:2017
Construction Manager at Risk
Various key characteristics of CM@Risk include: there are separate contracts for design services and for construction services; the contract for construction services may be entered into at the same time
Risk management
Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a project team and effectively assemble
End Event
An end event denotes the point at which a process’s path will come to an end. End events can only result in a “throw” of a result.[1] Symbol 1] Silver,
open interoperability
the meaning and benefits: single procurement of information that can be relied upon over time, removing the need for it to be repeatedly re-procured; a ‘Golden Thread’ of information to
BS EN ISO 29481-2:2016
Building information models — Information delivery manual Part 2: Interaction framework
Master Schedule
The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first
Start Event (Message)
A message is received from a participant, which initiates the process. The actual recipient of the message can be identified by connecting the event to a participant via a message

The importance of Information Requirements to a successful Asset Information Management (AIM) System
Introduction One of the challenges is the Appointing Party’s difficulties with the development of successful Operational Information Requirements in relation to asset management. Understanding the business challenges that define the
BS ISO 22263:2008
Organization of information about construction works Framework for management of project information

VEAM connector
VEAM connectors refer to a specific type of electrical bayonet type connectors known for their robustness and reliability in harsh environmental conditions. These connectors are commonly used in various industries,
computer-aided design (CAD)
Computer-aided design (CAD) encompasses the use of computers (hardware) and software to assist in the design process. CAD software is frequently used by different types of engineers and designers. CAD
Industry Foundation Classes (IFC)
conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is a standardized, digital description of
Physical Asset
A physical asset is an item of economic, commercial, or exchange value that has a material existence.Physical assets are also known as tangible assets.For most businesses, physical assets usually refer
Lean Project Delivery System
An organized implementation of Lean Principles and Tools combined to allow a team to operate in unison.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
AD Hoc Group (AHG)
AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting. The group is disbanded after
Resources
In the context of project management, the resources refer to optimizing the use of resources for successful project execution and the management of resources in the project. [1] Therefore, the
People
An element of a BIM strategy which is often overlooked. Clear communication is required as to why and how you intend to implement BIM and gain support by engaging BIM
diffusion
a process by which an innovation is communicated through certain channels over time among the members of a social system E.M. Rogers, Diffusion of Innovations, Free Press, New York, 1995.
Model
An electronic, three-dimensional representation of built asset or facility elements with associated intelligentattribute data (“Facility Data”). A Model term used in PAS 1192 specification has been replaced by term ‘Information
Design Build
A contract type used in construction, typical characteristics: There is a single contract for design services and construction services; design and construction of the project may be in sequential phases
BIM Strategic Lead
Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM staff duties include: Development of
k Factor
Factors for conductor materials from BS7671:2018,Table43.1. Different values are given for different types of conductor and insulatingmaterials. k2s2 used in adiabatic calculations gives the short-time withstand of a conductor in
smart building
The term “smart building” was originally introduced by the European Union in the Energy Performance of Buildings Directive (EPBD)[1] as one of the main enablers of the future of the built environment,
Insurance Backed Alliancing
A new procurement method coupled up with Integrated Project Insurance model (IPI) is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence
Circuit Protective Conductor (CPC)
Acircuit protective conductor (CPC) connects exposed-conductive-parts* of equipment to themain earthing terminal. *Conductive part of equipment,which can be touched and which is not normally live,but which can become live when
systems thinking
System thinking is an approach to integration based on the idea that each component or part of a system acts differently when isolated from its environment and other parts of
Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a
Appointed party
The appointed party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Supplier’ Typically it means Tier 2 and below Contractors Who can become
UML diagram
provides the data structure for data templates using objects, collections and relationships between them. The multiplicities in the UML diagram specify the range of allowablecardinality values, giving a specification of
objective
results to be achieved The objective can be strategic or operational; it can relate to different disciplines such as financial, health and safety, or environmental. The targeted results can be

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
top management
person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]
acceptance criteria
evidence required for considering that requirements have been fulfilled [cited from ISO 19650-2:2018(en), 3.1.1.1] Information issued via the Common Data Environment (CDE) must comply with Project Information Requirements (PIR) outlined