The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
Conformance Class
Conformance class allows establishing relations from the information model of BS EN 82045-2 to any other object of relevance available information model. For example, the Project Information Model (PIM) Conformance
workflow
The term ‘workflow’ is used in ISO 19650 instead of the PAS 1192 term ‘process’.
BS EN ISO 23387:2020
Building information modelling (BIM) — Data templates for construction objects used in the life cycle of built assets Concepts and principles

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys
replacement request
A replacement request corresponds to the creation of the property and the deactivation of the property it replaces. After validation of the replacement request by the experts, the replaced property
Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for
Openness
in relation to data and information – also linked to interoperability means that it is provided or made available in a format that can be accessed and used withoutrecourse to

information container
ELI5-S1 BIM Basics E12_Information Container explained A persistent set of information retrievable from within a file, system, or application storage hierarchy. [1] named persistent set of information retrievable from within

Psychological attributes of collaborative working
The psychology of workplace collaboration can be traced back to the everyday interactions that occur in any organization. In the fast-evolving business world, there is a rising need to move
Security Management Plan
A document (or part of a document) identified in the Information Particulars setting out the security requirements for carrying out the Works in a security-minded way, including any policies, protocols,
smart building
The term “smart building” was originally introduced by the European Union in the Energy Performance of Buildings Directive (EPBD)[1] as one of the main enablers of the future of the built environment,

x-ref
The term “X-ref” is commonly used as an abbreviation for “External Reference” in various technical and engineering fields, including construction, Building Information Modeling (BIM), and computer-aided design (CAD). Here’s a
Project setup
During project setup phase It is essential to establish and analyse a timeline that guides the entire team in delivering the project on time. Thus the prospective Lead Appointed Party
enumerated type value
data type consisting of a set of named values called elements, members, enumeral, or enumerators ofthe type

SHARED
All project Model Authors’ information for the use of the entire project team. The Federated Model Manager will combine all information for checking against the AIR. All team members should
Globally Unique Identifier (GUID)
globally unique identifier (GUID) its a unique object identifier that guarantees its uniqueness throughout its entire life unique, the identifier is usually generated using an algorithm a unique identifier generated
Collaborative Design
Working with different teams is probably the most difficult part of the design process. It is important to note that a collaborative design process is not about someone else creating
rationalise
In construction, to rationalise is to attempt to remove, explain or justify irrational quantities, processes or systems or else adjust unreasonable design decisions by employing logic or reason, (behaviour, attitude),
Post-contract BEP
This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead Appointed Party and
Asset Information Requirements (AIR)
Term introduced by ISO 19650 set of standards is related to information required during the operation phase of an asset AIR define managerial, commercial and technical aspects of information production,
Cost Led Procurement
A procurement method introduced by Constructing Excellence and the Cabinet Office intended to allow industry to use its experience and knowledge to develop innovative solutions through leveraging design, materials, subcontracting, direct labour
Appointor
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN

PAS 1192 vs ISO 19650 terms
Quick reference guide In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison. PAS references (superseded) ISO References (current) Pre-contract BEP Pre-appointment BEP Post-contract
ontology
An ontology is a set of rules that make it possible to link data on a semantic level. Means the unstructured, semi-structured data can be read and encoded by computers.
BS EN ISO 14004:2016
Environmental management systems General guidelines on implementation
Virtual Design and Construction
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time, cost, and ensure design intent.
Fault
Acircuit condition in which current flows through an abnormal or unintended path. The fault current may flow from line to line (phase fault) or line to earth (earth fault).
Facility Data
The non-graphical information attached to objects in the Model that defines various characteristics of the object. Facility Data can include properties such as parametric values that drive physical sizes, material

Problem Solving Process
Understanding the Problem-Solving Process
Effective problem-solving is at the heart of success in any field. Drawing inspiration from the book “General Relativity for Babies” by Chris Ferrie, which simplifies complex topics into easy-to-understand concepts, I have created a straightforward guide to the problem-solving process.
Miller’s law
Argument introduced by Miller, G. A., suggests that the number of objects an average human can hold in short-term memory is 7 ± 2.[1] From a practical standpoint, this means

BS8519 awareness of the changes
An email debate on whether BS 8519’s “dedicated cable support” rules really apply to central battery emergency lighting. We unpack the scope of BS 8519 vs BS 5266-1 and BS 7671, and what that means for segregation, containment and life-safety wiring on real projects.
Data Object
Data objects provide information about the activities that must be performed and/or the results that they produce. Elements of data objects must be contained within process or sub-process elements. Data
risk appetite
amount and type of risk that an organization is willing to pursue or retain [cited from ISO 19650-5:2020(en), 3.5]

Project Template_RVT_2022
Revit Electrical Project Template 2022 v22.2.1 Template For: Electrical Engineers, Bim Managers, Electrical Designers Setup: Typically 2–4 hours — quicker for experienced users. View Details Technical Details Released: Apr 29,

BS EN ISO 31000:2018
Risk management guidelines ISO 31000 is an international standard first published in 2009, the current version published in 2018. The standard contains principles and guidelines for effective risk management. It
Quantity Surveyor (QS)
person who provides financial and contractual advice and services for planning, carrying out and completion (3.5.23) of construction works https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25
Responsibility matrix
a chart that describes the participation by various functions in completing tasks or deliverables [cited from ISO 19650-1:2018(en), 3.1.1] Responsibility matrix shall be developed to cover information management activities and
Contract
Appointment ISO 19650 introduce term Appointment to be used instead of the more generic term contract. This means one term can be used for both external contracts and internal work
Project delivery team
In respect of asset lifetime PAS 1192-2:2013, describes one project delivery team, the term is connected with word ‘contract’ meaning one or many companies or individuals employed either directly or

Emergency Voice Communication System (EVCS)
What is an Emergency Voice Communication (EVC) system? An Emergency Voice Communication (EVC) system (also referred to as EVCS) is a fixed, monitored, two-way voice communication system that enables point-to-point
BS EN ISO 16757-2:2016
Data structures for electronic product catalogues for building services—Part 2: Geometry
major change
change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020

CPR Cable Classification Guide
Since July 2017, all power, control and communication cables permanently installed in buildings must comply with the Construction Products Regulation (CPR).
This guide is your reference for navigating Euroclass ratings, selecting compliant products.
Quality Assurance (QA)
Quality assurance (QA) is the action or process of verification that a requirement in terms of quality is being met. Managing the quality involves planning, establishing a workflow for fulfilling,
Project Information Model (PIM)
It is a term introduced in PAS 1192‑2: 2013 and ISO 19650 set of standards. It means any graphical or non-graphical information such as: Structured information, i.e.: schedules, costing and

Cutting Geometry with Nested Void Families in Revit
1. Generic Host in the Face-Based Family When you are in the face-based family, create void, and Cut the Generic Host This setup essentially simulates the cutting action within the
Permitted Purpose
A submittal state defining the intent or suitability. Permitted Purpose means any purpose related to the Works (and/or (without limitation) the construction, refurbishment, extension, operation, management and/or maintenance of the








