The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
NWD
NWD designates the published version of a Navisworks file with all loaded models, viewpoints, redlines, and comments saved to a single file. This file type can be opened with any
Point of Adoption
a moment in time where an organisation’s readiness, change into organisational capability/maturity Macro-BIM adoption: Conceptual structures Bilal Succar Mohamad Kassem Tweet The Point of Adoption (PoA) is not to be
Intermediate Event
An intermediate event is something that occurs between the beginning and end of a process. Triggers can be “caught” or “thrown” by intermediate events. [1] Symbol 1] Silver, B. (2009).
Crown Commercial Services (CCS)
The Crown Commercial Service (CCS) is an administrative agency and trading fund of the Cabinet Office of the UK Government, responsible for the supervision of the procurement of common goods
engineer
a person who designs and superintends the carrying out of civil engineering works, structures of buildings, installation of services, or who maintains such civil engineering works, structures or services https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25

UK BIM Framework (roadmap)
UK BIM Framework roadmap! Almost three years have passed since the first BS EN ISO19650-1 standard was published.A lot of work has been done; some people are upset about the
Last Planner System®
The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of
Key Performance Indicator (KPI)
KPI is an abbreviation for key performance indicator, which is a quantifiable measure of performance over time for a specific goal. KPIs provide goals for teams to aim for, milestones
Technical Committee (TC)
a Technical Committee (TC), which develops standards in a certain sector or industry; https://www.iso.org/glossary.html

CPR Cable Classification Guide
Since July 2017, all power, control and communication cables permanently installed in buildings must comply with the Construction Products Regulation (CPR).
This guide is your reference for navigating Euroclass ratings, selecting compliant products.
Post-appointment BEP
Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead
efficiency
correlation between the outcome and the resources used a measure of the utilization of resources to realize a given objective Note 1 to entry: An activity is efficient if it minimizes
Role
BIM roles are not necessarily related to specialist positions. It should be viewed as a function that could be fulfilled by more than one person and allow the transfer of
naming
The term naming in PAS 1192 is related to information container naming strategy, in ISO 19650 the therm is replaced by term ‘identification’ meaning remains the same
End Event
An end event denotes the point at which a process’s path will come to an end. End events can only result in a “throw” of a result.[1] Symbol 1] Silver,

Please can you confirm if the life system system has to be lidded?
Please can you confirm if the life system system has to be lidded? There is no requirement for the life system to be lidded. A lid is effectively required
domain
area of activity covering a science, a technique, a material, etc.Note 1 to entry: A domain can be associated with a group to which the property […] applies. BS EN

HVO Fuel
Hydrotreated Vegetable Oil (HVO) is a renewable, diesel-type fuel made from vegetable oils and fats instead of crude oil.
Subject to Simultaneous Overload
Where circuits are grouped, there are two availablemethods of calculating the rating factor Cg to be applied: [BS7671:2018,Appendix 4,5.1.2:Equation 2] [BS7671:2018,Appendix 4,5.1.2:Equation 3,4]
BS EN ISO 23386:2020
Building information modelling and other digital processes used in construction Methodology to describe, author and maintain properties in interconnected data dictionaries
fragmentation request
A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.
Model Upload Workflow
3D models shall be synchronized with the central cloud model after daily work is done to ensure the rest of the project team are coordinating with the latest information. All

The role of management in BIM implementation at a project and organisational level
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of dedicated BIM management role within

How to respond to request for proposal (RFP)
Introduction It can be said that the digitalization of construction began with designers moving from drawing boards to computers. [1] In Architecture, Engineering, Construction and Operation (ACEO), the focus has

Cable Ladder vs Perforated Cable Tray Selection Guide
Cable Ladder vs Perforated Cable Tray – Selection Guide (UK, 2025) Scope & references BS 7671:2018+A2:2022 and A3:2024 (selection & erection; installation reference methods; grouping). IET On‑Site Guide to BS
Thermal resistivity of the soil rating factor (Cs)
The rating factor Cs is applied to cable sizing calculations for cable installed in the ground. Its value varies according to the thermal resistivity of the soil in which the
Gross Internal Area (GIA)
The total area of buildings owned, occupied, or maintained, measured to the internal face of the perimeter walls at each floor level, is referred to as GIA (i.e. the footprint
vulnerability
weakness that can be exploited to cause harm [cited from ISO 19650-5:2020(en), 3.15]
Facility Lifecycle
This refers to the time span stretching from a building’s conception to demolition including the five distinctive phases (Planning, Design, Construction, Operations, and Disposition).1 1 The Massachusetts Port Authority, 2015.

digital construction campaign!
Thank you #willmottdixon team at our London Southbank University project for the #opportunity to participate in the #BIM & #digitalconstruction campaign! #LSBU #WDI, #WES, #team, #ConstructingPlainLanguage
Residual Current Device (RCD)
AResidual Current Device (RCD) is amechanical switching device or association of devices intended to cause the opening of the contacts when the residual current* attains a given value under specified
Risk Register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
Ground rating factor (Cc)
The rating factor Cc = 0.9 is applied to cable sizing calculations for cables installed in the ground (Installation Methods 70 to 73). See BS7671:2018,Appendix 4,Sections3,4 and 5.1.1.
deactivation request
A deactivation request corresponds to a modification of the property. After validating of the deactivation request by the experts, the value of the calculated status of the property changes to
carbon sink
A carbon sink is a natural or artificial reservoir that captures and stores morecarbon than it releases. Examples include forests, oceans, soil and potentially timber buildings. We need these reservoirs
Asset Information Requirements (AIR)
Term introduced by ISO 19650 set of standards is related to information required during the operation phase of an asset AIR define managerial, commercial and technical aspects of information production,
Conformity Assessment Committee (CASCO)
Committee whose secretariat is provided by ISO/CS that deals with conformity assessment and is responsible for the development of conformity assessment standards. https://www.iso.org/glossary.html
Intermediate Event (Link/Catching)
Paired link events can also be used as “off-page connectors” in order to print a process across multiple pages. Within the process level, they can also be used as generic
Integrated Project Delivery
Integrated Project Delivery (IPD) is a collaboration of all parties, systems and practices to optimize and maximize project success. Defined by the American Institute of Architects, IPD is typically applied
Design Web Format
Design Web Format (DWF), created by Autodesk. DWF is a compressed, non-editable, vector file format created by CAD and BIM applications. A DWF file can represent sheets for plotting purposes
BS 8536-2:2016
Briefing for design and constructionPart 2: Code of practice for asset management (Linear and geographical infrastructure)
Intermediate Event (Message/Catching)
A message intermediate event can be used to both send and receive messages. When used to “catch” the message, the event marker must be left empty. If the process was

UK Earthing & Bonding Design Reference
UK Earthing & Bonding Design Reference (Edition 2025 – aligned with BS 7671:2018+A2:2022, Amendment 3 (2024), and draft Amendment 4 (2026), also drawing from official UK Power Networks standards) Scope,
Golden thread
The (digital by default) record of predefined documents and building information required to ensure that the original design intent and any subsequent building changes are captured, preserved, and used to

Digital twin
ELI5-S1 BIM Basics E19_Digital Twin “The digital twin is the virtual representation of a physical object or system across its life-cycle. It uses real-time data and other sources to enable
NWC
NWC is a cache file. “When you open a CAD file in Navisworks, by default, a corresponding cache file (NWC) is created, which contains all of the conversion details required
Miller’s law
Argument introduced by Miller, G. A., suggests that the number of objects an average human can hold in short-term memory is 7 ± 2.[1] From a practical standpoint, this means
Industrial Internet of Things (IIoT)
The industrial IoT (IIoT) forms an integral part of Industry 4.0, and smart manufacturing refers to interconnected sensors, and other input/output devices linked to manufacturing applications, supporting industrial automation and
agent
…’An agent is just something that acts (agent comes from the Latin agree, to do). Of course, all computer programs do something, but computer agents are expected to do more:
Lean construction
Lean Construction is the method of project management aiming to reduce waste on a project and improving the efficiency and quality of produced work [1]. The aim to reduce overproduction,