Sub-Process (Collapsed)

The diagram does not show the details of the sub-process. A “plus” sign in the shape’s lower-left corner indicates that the activity is a sub-process with a lower level of detail.

Symbol

[1]     Silver, B. (2009). BPMN Method and Style: A levels-based methodology for BPM process modeling and improvement using BPMN 2.0. In CodyCassidy Press US.

Dictionary
Jarek Wityk

BIM Stages

ELI5-S1:BIM Basics: E13_Understanding BIM Stages Understanding BIM Stages: Transitioning from

Read More »

Ze

That part of the earth fault loop impedance which is

Read More »

share this page

Leave a Reply

Your email address will not be published. Required fields are marked *