The procedure to remove duplicate properties shall be carried out on the relevant attributes. The management of duplicates cannot be fully automated. BS EN ISO 23386:2020
WORKING GROUP (WG) Specialized group within a committee that is responsible for drafting a particular standard or set of deliverables. It is usually quite small, composed of experts and headed by
Association Française de Normalisation Asociation French Normalization Organization Regulation
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF
Building construction – Organization of information about construction works Part 2: Framework for classification
Building construction — Organization of information about construction works Part 3: Framework for object-oriented information
Framework for building information modelling (BIM) guidance STANDARDS BY ISO/TC 59/SC 13
Data structures for electronic product catalogues for building services—Part 2: Geometry
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 1: Concepts and principles
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2: Delivery phase of the assets
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling Part 3: Operational phase of the assets
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) Information management using building information modelling Part 5: Security-minded approach to information management
Information container for linked document delivery — Exchange specification Part 1: Container
Organization of information about construction works Framework for management of project information
BS EN ISO 29481-1 Building information models – Information delivery manual (IDM) PD ISO/TS 12911:201
ELI5-S1: BIM Basics E6: Metadata explained Understanding Metadata in Building Information Modeling (BIM) Metadata provides critical information about an item’s content, making it easier to locate and work with specific
a current state of development of an organisation to utilise information in an advanced strategic manner to increase productivity, measured against an assumed optimal state
A submittal state defining the intent or suitability. Permitted Purpose means any purpose related to the Works (and/or (without limitation) the construction, refurbishment, extension, operation, management and/or maintenance of the
An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail. The recent publication of ISO 19650 standards does not include
Digital Plan Of Work (DPoW) forms a framework that supports informed and consistent decision making by project teams, at each work stage, helping to deliver agreed and reliable information. The
person who provides financial and contractual advice and services for planning, carrying out and completion (3.5.23) of construction works https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25
The term BIMwash is derived from Whitewash, “a cheap white paint or coating of chalked lime used to quickly give a uniform clean appearance to a wide variety of surfaces”. Metaphorically, to
a process by which an innovation is communicated through certain channels over time among the members of a social system E.M. Rogers, Diffusion of Innovations, Free Press, New York, 1995.
ELI5-S1: BIM Basics E2: CDE Explained The purpose of using Common Data Environment (CDE) on a project is to provide the right person with the right information at the right
Originally coined in the 60s, The acronym has become a catch-all for a wide range of Facilities Management platforms and software. A CAFM system can be broadly defined as a collaborative,
results to be achieved The objective can be strategic or operational; it can relate to different disciplines such as financial, health and safety, or environmental. The targeted results can be
reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]
person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]
schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined by the ISO 19650 framework