Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 1: Concepts and principles
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2: Delivery phase of the assets
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling Part 3: Operational phase of the assets
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) Information management using building information modelling Part 5: Security-minded approach to information management
ELI5-S1: BIM Basics E6: Metadata explained Understanding Metadata in Building Information Modeling (BIM) Metadata provides critical information about an item’s content, making it easier to locate and work with specific
Digital Plan Of Work (DPoW) forms a framework that supports informed and consistent decision making by project teams, at each work stage, helping to deliver agreed and reliable information. The
The Asset Information Model or AIM is a term used to define the set of information gathered from all sources that support the continuing management of an asset
Term introduced by ISO 19650 set of standards is related to information required during the operation phase of an asset AIR define managerial, commercial and technical aspects of information production,
ELI5-S1: BIM Basics E2: CDE Explained The purpose of using Common Data Environment (CDE) on a project is to provide the right person with the right information at the right
ELI5-S1: BIM Basics E7: OIR explained information requirements in relation to organizational objectives BS EN ISO 19650‑1:2018 (3.3.3)
It is a term introduced in PAS 1192‑2: 2013 and ISO 19650 set of standards. It means any graphical or non-graphical information such as: Structured information, i.e.: schedules, costing and
The term, introduced by ISO 19650, describes a team of people working together on a specific task. task team might be an individual appointed party, and the appointed party might
In the construction industry, Tier 2 is a Contractor referred in ISO 19650 as the Appointed party with a sub-contract who provide goods or services directly to the Lead Appointed
In the construction industry, Tier 3 is a sub-contractor referred in ISO 19650 as the Appointed party and Task Team, with a sub-contract who provides goods or services directly to
All parties appointed for the project are defined as members of the Project Team. Each function can be fulfilled by either an individual or multiple people throughout the course of
reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]
person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]
person, organization or organizational unit involved in a construction process [cited from ISO 19650-1:2018(en), 3.2.1]
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]
The ISO 19650 framework is generally aimed for information management. The individual standards do not cover the whole area of quality management but instead point out to other standards suggesting
Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN
ELI5-S1 BIM Basics E16_Sensitive Information information, the loss, misuse or modification of which, or unauthorized access to, could:(a) adversely affect the privacy, welfare or safety of an individual or individuals;(b)
Computer science and IT In the fields of computer science and information technology, a federated information model refers to a structure where data is stored across multiple independent systems but can
infraction or violation of security (3.7) [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
With reference to BS EN ISO 19650 Framework, the working group could not conclude on international codification and standardised conventions. Hence Paul Shillcock and David Churcher, the lead authors, came
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists of the supplier’s: BIM assessment
The Master Information Delivery Plan (MIDP) is the primary plan for the preparation of project information (from the supplier’s perspective), which is set out as being required in the Exchange
The First Edition of the Building Information Model (BIM) Protocol published in 2013 identifies and puts into place specific obligations, liabilities and associated limitations on the use of the Building