The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
NWD
NWD designates the published version of a Navisworks file with all loaded models, viewpoints, redlines, and comments saved to a single file. This file type can be opened with any
minor change
change that does not affect the meaning, function or intended use NOTE 1 Definition applies to properties and groups of properties.NOTE 2 Examples of this type of change are new
Conditions of Satisfaction
An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel that he or she received
Intermediate Event (Link/Throwing) Gateway
A gateway is a device that controls the divergence and convergence of sequence flows in a process or choreography. As a result, it will determine path branching, forking, merging, and
Final Circuit
A circuit connected directly to current-using equipment, or to a socket-outlets or other outlet points for the connection of such equipment.
Consumer Unit
Atype of single-phase board for the control and distribution of electrical energy, principally in domestic premises. In the ProDesign software,a consumer unit (CU) can be split into three sections,each with
Pre-appointment BEP
Pre-appointment BEPs communicates the delivery team’s intended approach to the information management process in the project, it is submitted as part of the prospective Lead Appointed Party tender response. For
asset
An asset is anything that has potential or actual value, whether a resource or a value that can be converted into capital. An organisation or individual expects the asset to
Quantity Surveyor (QS)
person who provides financial and contractual advice and services for planning, carrying out and completion (3.5.23) of construction works https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25
pre-design process
construction process (3.3.2) determining construction properties (3.5.1) for the built environment (3.1.7) before it is designed[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).

x-ref
The term “X-ref” is commonly used as an abbreviation for “External Reference” in various technical and engineering fields, including construction, Building Information Modeling (BIM), and computer-aided design (CAD). Here’s a

Electric Vehicle Charging Points
Active charging points are fully wired and connected, ready-to-use charging points.
A passive charging point, on the other hand, is the infrastructure without the final charging unit installed.
BS EN ISO 29481-2:2016
Building information models — Information delivery manual Part 2: Interaction framework
Contract Particulars
Contract Particulars refer to the document outlining the Framework Agreement’s specific core terms, which may include but are not limited to the Pricing Schedule, Authorised Officer, Contract Manager, Key Personnel,

Selectivity
Resolving Selectivity Issues in Electrical Design Free Trimble ProDesign Introduction Training Course Click the button below for more details: ProDesign Course Selectivity is achieved where,under overcurrent conditions, the protective device
data aggregation
Data aggregation refers to a process that involves gathering information and expressing it in summary form for statistical analysis or other purposes. In many cases, data aggregation is exclusively done
Data Object
Data objects provide information about the activities that must be performed and/or the results that they produce. Elements of data objects must be contained within process or sub-process elements. Data
Supporting Information
Supporting information shall be used where applicable and relevant to fully understand and evaluate information requirements or acceptance criteria. Supporting information includes but is not limited to: Existing site surveys

ELE_Generator_Rehlko D330 (M237)
.pd-product-info-container, .pd-product-info-container * { font-family: “IBM Plex Sans”, “IBM Plex Sans Condensed”, Arial, sans-serif !important; } .pd-product-info-container .pd-expand-toggle { background: #f8f9fa !important; border: 1px solid #bdc3c7 !important; border-radius: 6px !important;
Value Stream
Includes all the processes and activities used to design, produce and deliver the product or service to the Customer.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and
Project Information Model (PIM)
It is a term introduced in PAS 1192‑2: 2013 and ISO 19650 set of standards. It means any graphical or non-graphical information such as: Structured information, i.e.: schedules, costing and
Portable document format (PDF)
It’s a versatile file format developed by Adobe that allows people to easily present and exchange documents – regardless of the software, hardware, or operating systems used by anyone who
Facility Lifecycle
This refers to the time span stretching from a building’s conception to demolition including the five distinctive phases (Planning, Design, Construction, Operations, and Disposition).1 1 The Massachusetts Port Authority, 2015.
Tier 2
In the construction industry, Tier 2 is a Contractor referred in ISO 19650 as the Appointed party with a sub-contract who provide goods or services directly to the Lead Appointed
task team
The term, introduced by ISO 19650, describes a team of people working together on a specific task. task team might be an individual appointed party, and the appointed party might

Psychological attributes of collaborative working
The psychology of workplace collaboration can be traced back to the everyday interactions that occur in any organization. In the fast-evolving business world, there is a rising need to move
record
document stating results achieved or providing evidence of activities performed [1] Note 1 to entry: Adapted from ISO 9000:2005, 3.7.6. 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
Harmonic rating factor (Ch)
Ch Rating factor used for calculating theminimum required cable size in the presence of harmonic currents.See BS7671:2018,Appendix 4, section 5.5.

Insurance Backed Alliancing projects under the IPI model
Introduction Martin Davis member of the New Models of Construction Procurement (NMCP) Working Group and the Integrated Project Insurance (IPI) mentor describes the Integrated Project Insurance model (IPI) coupled up
Global Trade Item Number (GTIN)
Global Trade Item Number (GTIN) identifier for trade items used to look up product information in a database GS1 [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search
Royal Institute of British Architects (RIBA)
RIBA Plan Of Work 2020 0 – Strategic Definition is about determining the best means of achieving the client’s requirements. An open mind is required because a building might not
Required Standard
means the level of skill and care applicable to the Party’s equivalent obligation under the Appointment. [1] [1] UK BIM Framework, 2020. Information protocol to support BS EN ISO 19650-2

lead appointed party
The term introduced by ISO 19650 typically describes the Tier 1 Main Contractor. For example: : The Lead Appointed Party is a specific entity directly appointed (employed) by the primary
trigger event
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]

HVO Fuel
Hydrotreated Vegetable Oil (HVO) is a renewable, diesel-type fuel made from vegetable oils and fats instead of crude oil.
attribute
Depending on the technology discussed, the term attribute can be treated as equivalent to a property or as a set of attributes, such as the number of elements in a

BIM Classification and Standardization Systems
Introduction There are companies in the construction industry which do not favour standardization; these companies benefit from revenue and profits from change orders (variations), inevitably resulting in claims increasing cost
Cyber-Physical Systems
Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a Cyber-Physical System is a Digital
BS 7799‑3:2017
Information security management systemsPart 3: Guidelines for information security risk management (revision of BS ISO/IEC 27005:2011)

Organisational maturity
a measure of an organisation’s readiness and capability expressed through its people, workflows, information, technologies and the reliable measurement procedures that are in place [source: Understanding Organizational Maturity

Organisational capability
Potential and expertise suggesting ability. Capability implies an organisation’s capacity to engage in a range of constructive activities Organisational capability is also referred to as organisational competence, although a capability refers to the
Sub-Process (Collapsed)
The diagram does not show the details of the sub-process. A “plus” sign in the shape’s lower-left corner indicates that the activity is a sub-process with a lower level of
Semantic Web
The Semantic Web, as defined by Ontotext[1] is the extension of the existing information and data on a network (or Web) to include data descriptors, which are intended to allow
Management of Sustainability in BIM
Introduction Sustainability in terms of Building Information Modelling (BIM) was defined as the sixth dimension of BIM by a large consulting firm as “what to do in terms of sustainability”[1]
Project Implementation Plan (PIP)
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists of the supplier’s: BIM assessment
Device rating (In)
Circuit Protective Device rating,or ‘In’ in Amperes. If the overload setting can be adjusted, then the ‘adjusted rating’ is known as ‘Ir’.
Value
What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.

Emergency Lighting in Toilet Cubicles
Summary
1. If the toilet has borrowed light and is less than 8m square:
a. There is no need for emergency lighting, however,
b. If there is a cubicle with full height door – therefore closed without borrowed lighting – then the EM lighting would be required in that cubicle.
2. If the overall toilet has no borrowed light,
a. And the WC cubicles do not have full-size doors; there should be at least one emergency outside row of cubicles.
b. If there is a cubicle with full height door – therefore closed without borrowed lighting – then the EM lighting would be required in that cubicle.
Circuit Protective Conductor (CPC)
Acircuit protective conductor (CPC) connects exposed-conductive-parts* of equipment to themain earthing terminal. *Conductive part of equipment,which can be touched and which is not normally live,but which can become live when