The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
tertiary power source
A Uninterruptible Power Supply (UPS) or standby generator connected to dedicated final circuits of the distribution infrastructure. Enhance the infrastructure resilience and can improve maintenance opportunities and business continuity for

BIM Stages
ELI5-S1:BIM Basics: E13_Understanding BIM Stages Understanding BIM Stages: Transitioning from BIM Levels to a Modern Framework In the world of Building Information Modeling (BIM), we often come across terms like

BIM Classification and Standardization Systems
Introduction There are companies in the construction industry which do not favour standardization; these companies benefit from revenue and profits from change orders (variations), inevitably resulting in claims increasing cost

BS EN ISO IEC 27000:2020
Information technology – Security techniques – Information security management systems – Overview and vocabulary ISO 27000 is derived from the British Standard 7799, published in 1995 in three parts: BS-7799,
risk register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.

information container
ELI5-S1 BIM Basics E12_Information Container explained A persistent set of information retrievable from within a file, system, or application storage hierarchy. [1] named persistent set of information retrievable from within
Employer
Appointing party ISO 19650 term depends on where in the hierarchy the employer is located.The BS EN ISO 19650‑2 appointing party (A) is the equivalent of the PAS 1192‑2:2013 top‑level

The Level of and Progression Management systems
The ISO 19650 set of standards introduces a new term: ‘Level of information need’ which is designed to replace the terms used in BS EN 1192 such as Level of

Psychological attributes of collaborative working
The psychology of workplace collaboration can be traced back to the everyday interactions that occur in any organization. In the fast-evolving business world, there is a rising need to move
Pre-appointment BEP
Pre-appointment BEPs communicates the delivery team’s intended approach to the information management process in the project, it is submitted as part of the prospective Lead Appointed Party tender response. For
data aggregation
Data aggregation refers to a process that involves gathering information and expressing it in summary form for statistical analysis or other purposes. In many cases, data aggregation is exclusively done

PUBLISHED
Information accepted by the nominated party, in which case it will be suitable for tender or construction (2D model output only). Such that the ‘Published’ area should be maintained in
Gateway (Parallel)
[And] When used to split the sequence flow, all outgoing branches are activated at the same time. When parallel branches are merged, it waits for all incoming branches to complete
unit
standard measurements of physical quantities that require a clear definition to be useful. The International Bureau of Weights and Measures (BIPM) is responsible for ensuring the standardization of the use
top management
person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]
Project BIM Manager
Responsible for ensuring that the BIM workflow has been established for the project and is adhered to by the team during the implementation stages of the project. [Appointment: Lead Appointed

Appointed Party context of information exchange
ELI5-S2: BIM in Practice E6: Appointed Party context of information exchange Understanding the Appointed Party (T2-T4) Context of Information Exchange in BIM Welcome to the final instalment of our ELI5-S2
Infrastructure
the structures that emphasize, organise and enable social functions. Individual units of infrastructure are known as assets. It is sometimes subcategorised into economic infrastructure, the networks of built assets that
Residual Current Device (RCD)
AResidual Current Device (RCD) is amechanical switching device or association of devices intended to cause the opening of the contacts when the residual current* attains a given value under specified
Assignment matrix
Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192] The former is illustrated as
security
state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]

Electric Vehicle Charging Points
Active vs Passive Electric Charging Points Explained Active Charging Points Active charging points are fully wired and connected, ready-to-use charging points at parking spaces – an actual socket connected to
Model View Definition (MVD)
One or more specific information exchange requirements may necessitate the need for a model view definition (MVD). A machine-readable representation of MVDs is required when using them in software development.

Exchange Information Requirements (EIR)
The Exchange Information Requirements (EIR) term introduced by BS EN 19650 replaces the PAS 1192 term Employer Information Requirements (EIR) on all projects where BS EN ISO 19650 compliance is
Operations and Maintenance (O&M)
Describes the functions, duties, and labour associated with the operations of an asset, including repairs, replacement of parts and structural components, and other activities needed to maintain an asset.
Workset
A workset is a collection of elements in a work shared Revit project. The purpose of worksets is to enable multiple users to work on the same project and facilitate
smart asset management
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
Status
Identifier indicating the characteristic of an element of information for which at all times a value can be established. Word status has been included in ISO 19650 Framework meant to

LTF_Lighting-Fixture Circular
Create unlimited lighting variations with advanced parametric control Introduction The PD_LTF_Lighting-Fixture_Luminaire-Circular Family is a powerful, fully parametric Revit family that allows users to create limitless lighting fixture configurations, all at LOD
plan of work
It is a project-specific “digitally checkable” framework set-up to ensure that the deliverables of all contributors are identified and appropriate to the decisions required at each work stage. The plan
Problem Solving Process
ELI5-S2: BIM in Practice E7: problem solving process explained Understanding the Problem-Solving Process Effective problem-solving is at the heart of success in any field. Drawing inspiration from the book “General

Young Person
The term “Young Person” in the context of construction, Building Information Modeling (BIM), electrical engineering, or general engineering typically refers to a younger individual, often a recent graduate or entry-level
TN system
A system having one or more points of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to that point by protective conductors.
Management of Sustainability in BIM
Introduction Sustainability in terms of Building Information Modelling (BIM) was defined as the sixth dimension of BIM by a large consulting firm as “what to do in terms of sustainability”[1]
BS EN 17412‑1:2020
Building Information Modelling — Level of Information NeedPart 1: Concepts and principles
Risk management
Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a project team and effectively assemble
Role
BIM roles are not necessarily related to specialist positions. It should be viewed as a function that could be fulfilled by more than one person and allow the transfer of
Specialist BIM Manager / Coordinator
The Specialist BIM Coordinator duties will reflect those for the Project BIM Coordinator but will be specific for discipline or trade-specific models and data deliverables. Responsible for checking, reviewing and
Miller’s law
Argument introduced by Miller, G. A., suggests that the number of objects an average human can hold in short-term memory is 7 ± 2.[1] From a practical standpoint, this means
information requirement
The information needed to support a business or other activity. specification for what, when, how and for whom information (3.3.1) is to be produced [cited from ISO 19650-1:2018(en), 3.3.2] Term directly related to:
Commissioning
A building has successfully gone through the commissioning process when its equipment and systems have been examined and tested to perform as designed, and its operators have been trained to
BS EN ISO 23386:2020
Building information modelling and other digital processes used in construction Methodology to describe, author and maintain properties in interconnected data dictionaries
Fabrication Model
Digital Model(s) created from shop drawings to support fabrication and installation. Fabrication models are reviewed and approved by the A/E for conformance to design specifications.1 1 The Massachusetts Port Authority,

VEAM connector
VEAM connectors refer to a specific type of electrical bayonet type connectors known for their robustness and reliability in harsh environmental conditions. These connectors are commonly used in various industries,
Current carrying capacity of a cable (Iz)
Iz The current carrying capacity of a cable under the defined installation conditions. This is the effective rating of the cable after the relevant rating factors have been applied, i.e.,Ca,
Conditions of Satisfaction
An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel that he or she received

Force Relinquish
Tip of the Day (TOD): How to Relinquish Locked Revit Models If you’ve ever been frustrated by locked Revit model elements when a team member is unavailable to relinquish them,
third party
person or body that is recognized as being independent of the parties involved with the issues in question [1] Note 1 to entry: “Parties involved” are usually supplier (“first party”) and purchaser (“second party”). 1