The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
ubiquitous access
The modern era of IT has turned to ubiquitous access to all organizations and users. The vision is to provide one “universal access,” i.e. access to all IT services, regardless
Physical Asset
A physical asset is an item of economic, commercial, or exchange value that has a material existence.Physical assets are also known as tangible assets.For most businesses, physical assets usually refer
Last Planner®
The person or group that makes assignments to direct workers. Project Architect and ‘discipline lead’ are common names for last planners in design processes. ‘Superintendent’ or ‘foremen’ are common names
fragmentation request
A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.

COBie data drop
COBie data drop Individual COBie data drops are the responsibility of Task Team BIM Managers, who must upload the required information containers in accordance with Exchange Information Requirements (EIR).The COBie
carbon sink
A carbon sink is a natural or artificial reservoir that captures and stores morecarbon than it releases. Examples include forests, oceans, soil and potentially timber buildings. We need these reservoirs
National BIM Standard
National BIM Standard (NBIMS) – United States Version 2 is sponsored by National Institute of Building Sciences (NIBS) under its BuildingSMART Alliance Council. [1] [1] The Massachusetts Port Authority, 2015.

BS EN ISO 31000:2018
Risk management guidelines ISO 31000 is an international standard first published in 2009, the current version published in 2018. The standard contains principles and guidelines for effective risk management. It
PAS1192-2_2015
The Publicly Available Specification (PAS) 1192 part two was published in February 2013; the specification was based on existing Code of practice BS 1192 dated 2007 amended in October 2015

CPR Cable Classification Guide
Since July 2017, all power, control and communication cables permanently installed in buildings must comply with the Construction Products Regulation (CPR).
This guide is your reference for navigating Euroclass ratings, selecting compliant products.
Point of Adoption
a moment in time where an organisation’s readiness, change into organisational capability/maturity Macro-BIM adoption: Conceptual structures Bilal Succar Mohamad Kassem Tweet The Point of Adoption (PoA) is not to be

CDE state
ELI5-S1: BIM Basics E5: CDE areas and states This term replaces the ‘CDE area’ PAS 1192 term, the idea is the location of the information (container) is not important but
International Harmonized Stage Codes
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF

PAS 1192 vs ISO 19650 terms
Quick reference guide In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison. PAS references (superseded) ISO References (current) Pre-contract BEP Pre-appointment BEP Post-contract
Clash Detection
Clash detection, coordination analysis and data checks shall be carried out by the BIM Coordinators against the latest shared models. The workflows involve a combination of visual and automated checks
Risk Register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.

The importance of Information Requirements to a successful Asset Information Management (AIM) System
Introduction One of the challenges is the Appointing Party’s difficulties with the development of successful Operational Information Requirements in relation to asset management. Understanding the business challenges that define the
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys

Restricted and Highly Restricted information
Info Below you can find a couple of sample notes intended to be copied and pasted to a transmittal when sharing Restricted and Highly Restricted information. Restricted Information This transmittal
Set-Based Design
Set-Based Design commonly referred to as a set-based design innovation or set-based concurrent engineering. It is a product development approach where teams consider a wide range of design alternatives (a
Information model
set of structured and unstructured information containers (3.3.12) [cited from ISO 19650-1:2018(en), 3.3.8] ISO 19650 framework concentrates specifically on the information model concept, a term that contains multiple types of information (geometrical
Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a
Conformity Assessment Committee (CASCO)
Committee whose secretariat is provided by ISO/CS that deals with conformity assessment and is responsible for the development of conformity assessment standards. https://www.iso.org/glossary.html
definition
representation of a concept by a descriptive statement which serves to differentiate it from related concepts Note 1 to entry: A definition may be expressed as natural language text (a textual
Builders work in connection (BWIC)
Coordination of Builders work in connection to services i.e. openings in walls or floors for MEP Services It is anticipated that as a minimum, all builders work openings of 50x50mm
system of insight
A system of insights can helps your company make decisions, and it is designed to be part of business decision-making process. It involves gather data, use it, find relationships and
geometrical
This is an ISO 19650 term which replaces the PAS1192 term “graphical”. Geometrical is more appropriate to describe spatial positioning and relationships

Life Safety Generator
Life Safety Generator selection guide Copy If the secondary power supply is provided for firefighter’s lift, it must be capable of operating the firefighter’s lift at its full rated load
Integrated Project Insurance (IPI)
The integrated Project Insurance model (IPI) coupled up with Insurance Backed Alliancing is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence
Miller’s law
Argument introduced by Miller, G. A., suggests that the number of objects an average human can hold in short-term memory is 7 ± 2.[1] From a practical standpoint, this means

x-ref
The term “X-ref” is commonly used as an abbreviation for “External Reference” in various technical and engineering fields, including construction, Building Information Modeling (BIM), and computer-aided design (CAD). Here’s a
Project BIM Manager
Responsible for ensuring that the BIM workflow has been established for the project and is adhered to by the team during the implementation stages of the project. [Appointment: Lead Appointed

Appointed Party context of information exchange
ELI5-S2: BIM in Practice E6: Appointed Party context of information exchange Understanding the Appointed Party (T2-T4) Context of Information Exchange in BIM Welcome to the final instalment of our ELI5-S2
Industry Foundation Classes (IFC)
conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is a standardized, digital description of
BS ISO IEC 33020:2019
Information technology—Process assessment Process measurement framework for assessment of process capability

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The

Organizational Information Requirements (OIR)
ELI5-S1: BIM Basics E7: OIR explained information requirements in relation to organizational objectives BS EN ISO 19650‑1:2018 (3.3.3)
Master Schedule
The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first

HVO Fuel
Hydrotreated Vegetable Oil (HVO) is a renewable, diesel-type fuel made from vegetable oils and fats instead of crude oil.

Selectivity
Resolving Selectivity Issues in Electrical Design Free Trimble ProDesign Introduction Training Course Click the button below for more details: ProDesign Course Selectivity is achieved where,under overcurrent conditions, the protective device
Model Upload Workflow
3D models shall be synchronized with the central cloud model after daily work is done to ensure the rest of the project team are coordinating with the latest information. All
System of engagement
The System of Engagement is defined as a platform that manages supported digital engagement, of systems like Browsing, Web Chat, Messaging, videos (Facebook, WhatsApp, TEAMS, ZOOM, Signal, Slack, etc.), various
Furniture, Fixtures, Equipment (FFE)
Furniture, Fixtures, Equipment (FFE) a systems furniture layout within an asset
intrinsic aspect
role that an aspect plays in a relationship with a possessor and that is dependent on the aspect as well as on the possessing object Note 1 to entry: Typically the

BIM and Lean Construction
Introduction The term referred to as Lean Construction aims to reduce overproduction, minimise handling, storage, transportation, or remove processes that do not add value. The Construction industry recognized the potential
buildingSMART Data Dictionary
PD 19650‑0:2019 In short, the BuildingSMART Data Dictionary is a library for everything to do with the building. NumberName is an int key and string value that can be stored
digital built environment
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
BIM Strategic Lead
Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM staff duties include: Development of
Golden thread
The (digital by default) record of predefined documents and building information required to ensure that the original design intent and any subsequent building changes are captured, preserved, and used to