The Ultimate BIM Knowledge Hub

Your one-stop resource for BIM electrical.
0 Total Posts

Golden thread

The (digital by default) record of predefined documents and building information required to ensure that the original design intent and any subsequent building changes are captured, preserved, and used to

Read More »

Status

Identifier indicating the characteristic of an element of information for which at all times a value can be established. Word status has been included in ISO 19650 Framework meant to

Read More »

Value

What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.

Read More »

End Event (Message)

At the end of the process, this type of end indicates that a message is sent to a participant.[1] Symbol N Method and Style: A levels-based methodology for BPM process

Read More »

purposeful

having a definite objective and strong desire to achieve it In the context of BIM, it describes a people-centric transformation, regarding information as an asset

Read More »
Step 3 installation drawing of the ARR906U AFDD being fitted beside a circuit breaker on a DIN rail and busbar
How To

Arc Fault Detection Devices (AFDDs) 

Arc Fault Detection Devices (AFDDs) in the UK: Technical Requirements and Implementation Executive Summary Arc Fault Detection Devices (AFDDs) represent a significant advancement in electrical fire safety. This whitepaper provides

Read More »

Construction Manager at Risk

Various key characteristics of CM@Risk include: there are separate contracts for design services and for construction services; the contract for construction services may be entered into at the same time

Read More »

The Gemini Principles

Purpose: Must have clear purpose Public good Must be used to deliver genuine public benefit in perpetuity Value creation Must enable value creation and performance improvement Insight Must provide determinable

Read More »

Z2

Z2 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the circuit protective conductor (cpc) of the circuit under consideration.

Read More »

Harmonic

The presence of harmonic content in the line conductors of a three-phase and neutral circuit can give rise to excessive levels of load current in the neutral conductor.

Read More »
Hierarchical project team chart showing appointing party, lead appointed parties and appointed parties in tiers 0 to 4
Dictionary

Project Team

All parties appointed for the project are defined as members of the Project Team. Each function can be fulfilled by either an individual or multiple people throughout the course of

Read More »

Infrastructure

the structures that emphasize, organise and enable social functions. Individual units of infrastructure are known as assets. It is sometimes subcategorised into economic infrastructure, the networks of built assets that

Read More »

Product Data Definition

A Product Data Definition (PDD) document intended to provide a consistent methodology for the definition, creation, management and sharing of product information throughout the life cycle of an asset, based

Read More »

major change

change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020

Read More »

Clash Detection

Clash detection, coordination analysis and data checks shall be carried out by the BIM Coordinators against the latest shared models. The workflows involve a combination of visual and automated checks

Read More »

Digital Construction

The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the

Read More »

ontology

An ontology is a set of rules that make it possible to link data on a semantic level. Means the unstructured, semi-structured data can be read and encoded by computers.

Read More »

data template

schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with the term “data template”. E.g.

Read More »

Last Planner System®

The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of

Read More »

fragmentation request

A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.

Read More »

National Annex (NA)

With reference to BS EN ISO 19650 Framework, the working group could not conclude on international codification and standardised conventions. Hence Paul Shillcock and David Churcher, the lead authors, came

Read More »

Look Ahead Plan

A short interval plan, based on the pull/phase plan, that identifies all the activities to be performed in the next 6 (or other) weeks. The 6W Look-Ahead Schedule (LAS) is

Read More »

Federated Information Model

Computer science and IT In the fields of computer science and information technology, a federated information model refers to a structure where data is stored across multiple independent systems but can

Read More »

Responsibility matrix

a chart that describes the participation by various functions in completing tasks or deliverables [cited from ISO 19650-1:2018(en), 3.1.1] Responsibility matrix shall be developed to cover information management activities and

Read More »

Set-Based Design

Set-Based Design commonly referred to as a set-based design innovation or set-based concurrent engineering. It is a product development approach where teams consider a wide range of design alternatives (a

Read More »

blockchain

The blockchain is a transaction database shared by all nodes involved in the system based on the Bitcoin protocol. It is a data structure consisting of linked blocks (e.g. confirmed

Read More »

Cyber-Physical Systems

Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a Cyber-Physical System is a Digital

Read More »

model validation checklist

The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes. Table 1 – Model Validation Checklist Check Definition Project

Read More »

expert

person who, through knowledge or experience, has competence to give an opinion in the fields about which he/she is consulted[SOURCE: ISO 13302:2003, 3.10, modified — The domain “” has been

Read More »

Security Management Plan

A document (or part of a document) identified in the Information Particulars setting out the security requirements for carrying out the Works in a security-minded way, including any policies, protocols,

Read More »

Level of model definition

The PAS1192 term is replaced by ‘Level of information need’ an ISO19650 term Level of information need is a more generic term than any of the existing “Level of …”

Read More »

actor

person, organization or organizational unit involved in a construction process [cited from ISO 19650-1:2018(en), 3.2.1]

Read More »

AD Hoc Group (AHG)

AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting. The group is disbanded after

Read More »

BIM Strategic Lead

Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM staff duties include: Development of

Read More »

Assignment matrix

Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192] The former is illustrated as

Read More »

graphical

The PAS1192 term has been replaced by ISO19650 term ‘geometrical’ Geometrical is more appropriate to describe spatial positioning and relationships

Read More »

Team’s Capability and Capacity

The competence and understanding of BIM, of the consultants and delivery team partners to be involved in the project, shall be assessed and results included in Post-Contract BEP. The assessment

Read More »

Master Schedule

The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first

Read More »