The Ultimate BIM Knowledge Hub

Your one-stop resource for BIM electrical.
0 Total Posts

Facility Lifecycle

This refers to the time span stretching from a building’s conception to demolition including the five distinctive phases (Planning, Design, Construction, Operations, and Disposition).1 1 The Massachusetts Port Authority, 2015.

Read More »

asset management

coordinated activity of an organization to realize value from assets Note 1 to entry: Realization of value will normally involve a balancing of costs, risks, opportunities and performance benefits.Note 2

Read More »
ISO 19650 Framework Components Relationship diagram linking OIR, AIR, PIR, EIR, AIM, PIM, BEP, MIDP and TIDP within the CDE
Dictionary
Jarek Wityk

BIM Levels

The transition from the BIM Levels to the concepts in the ISO 19650 series and the UK BIM Framework represents a shift in how we think about BIM maturity. However,

Read More »

The Gemini Principles

Purpose: Must have clear purpose Public good Must be used to deliver genuine public benefit in perpetuity Value creation Must enable value creation and performance improvement Insight Must provide determinable

Read More »

Look Ahead Plan

A short interval plan, based on the pull/phase plan, that identifies all the activities to be performed in the next 6 (or other) weeks. The 6W Look-Ahead Schedule (LAS) is

Read More »

Internet of Things (IoT)

This phrase refers to networked infrastructures that interconnect physical objects and allow for the management of the data they generate. A typical example of IoT is a home energy monitor

Read More »

Workspace

A collection of content libraries and supporting files that define and embody a BIM standard. A workspace includes BIM libraries such as wall types, standard steel shapes, furniture, HVAC fittings,

Read More »

Miller’s law

Argument introduced by Miller, G. A., suggests that the number of objects an average human can hold in short-term memory is 7 ± 2.[1] From a practical standpoint, this means

Read More »

Message Flow

A message flow depicts the exchange of messages between two participants who are ready to send and receive them. A message flow must connect two distinct pools. They are either

Read More »

Built Environment

All forms of buildings (residential, industrial, commercial, hospitals, schools), all economic infrastructure (above and below ground) and the urban space and landscape between and around buildings and infrastructure3, as well

Read More »

supply chain

Term used to describe the relationship between organisation that provide materials, products or services for the client. Referring to ISO 19650 Framework the supply chain is synonymous to a ‘delivery

Read More »
The shared context of information exchange: slide 1 from the Project Design ELI5 BIM in Practice explainer
Blog
Jarek Wityk

Shared context of information exchange

ELI5-S2: BIM in Practice E1: Shared context of information exchange Introducing the “ELI5-S2 BIM in Practice” Series! Welcome to the first post in our new series, “BIM in Practice,” where

Read More »
Graphic headed Domestic PV sizing rule-of-thumb, RoT, with solar panel, thumbs up, battery and inverter icons
How To
Jarek Wityk

Domestic PV sizing rule-of-thumb (RoT)

Domestic PV sizing rule-of-thumb (RoT) Grid-tied, focused on self-consumption UK rule-of-thumb (RoT) Peak Sun Hours (PSH): 3.5 summer, 2.0 spring/autumn, 1.0 winter For calc use Peak Sun Hours (PSH) =

Read More »

Permitted Purpose

A submittal state defining the intent or suitability. Permitted Purpose means any purpose related to the Works (and/or (without limitation) the construction, refurbishment, extension, operation, management and/or maintenance of the

Read More »

Dimensionality

A dimension of space, such as width, height, or length. can be zero-dimensional (location point), one-dimensional (e.g. line, curve, path), two-dimensional (e.g. surface, face), or three-dimensional (e.g. surface, face) (e.g.

Read More »

Final Circuit

A circuit connected directly to current-using equipment, or to a socket-outlets or other outlet points for the connection of such equipment.

Read More »

Portable document format (PDF)

It’s a versatile file format developed by Adobe that allows people to easily present and exchange documents – regardless of the software, hardware, or operating systems used by anyone who

Read More »

Collaborative Design

Working with different teams is probably the most difficult part of the design process. It is important to note that a collaborative design process is not about someone else creating

Read More »

Z2

Z2 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the circuit protective conductor (cpc) of the circuit under consideration.

Read More »

Distributed Ledger Technology

Distributed Ledger Technology (DLT) is an encrypted and distributed database that serves as a register for storing records of transactions. At the core of DLT is a data model that

Read More »
Drone, remote controller, laptop and white hard hat on a concrete ledge at a construction site
Dictionary
Jarek Wityk

BIM

Building Information Modelling (BIM)[1] broadly describes the processes employed during digital information management related to a built asset such as a building, bridge, highway or tunnel. ISO 19650 outlines a

Read More »

Integrated Project Insurance (IPI)

The integrated Project Insurance model (IPI) coupled up with Insurance Backed Alliancing is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence

Read More »

Activity

An identifiable chunk of work with recognized prerequisites to begin and a recognized State of Completion – or Conditions of Satisfaction. Another way to look at an activity – establish

Read More »

Delivery team

In ISO 19650 the Delivery team term replaces the term ‘ Project Delivery team’ the meaning meant to remain the same, but the change puts the client (Appointing Party) outside

Read More »

minor change

change that does not affect the meaning, function or intended use NOTE 1 Definition applies to properties and groups of properties.NOTE 2 Examples of this type of change are new

Read More »

Grouping rating factor (Cg)

Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a

Read More »
Flowchart choosing the earthing system: TN-C-S PME, TN-C-S variant PNB, TN-S and TT, each with a typical Ze value
How To
Jarek Wityk

UK Earthing & Bonding Design Reference

UK Earthing & Bonding Design Reference (Edition 2025 – aligned with BS 7671:2018+A2:2022, Amendment 3 (2024), and draft Amendment 4 (2026), also drawing from official UK Power Networks standards) Scope,

Read More »
Infographic Level of Information Need, getting your BIM data just right, covering what it is and why it matters
Blog
Jarek Wityk

Level of information need

Ever feel like you’re drowning in BIM data you don’t need, or scrambling for details that should’ve been there? Enter the concept of Level of Information Need. It’s a straightforward idea buried behind a not-so-straightforward name (looking at you, BS EN ISO 7817-1:2024). In plain English, a Level of Information Need defines exactly what information should be delivered – no more, no less – for a given BIM use case or project stage.

Read More »

facility

physical structure (asset) or installation, including related site, works, serving one or more main purposeNOTE: Typically, a facility will require management over part or all of its life cycle. The

Read More »

security

state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]

Read More »
On this page

    share this page