The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
BS ISO IEC 33020:2019
Information technology—Process assessment Process measurement framework for assessment of process capability
Golden thread
The (digital by default) record of predefined documents and building information required to ensure that the original design intent and any subsequent building changes are captured, preserved, and used to
Quality Planning (QP)
Quality Planning (QP) is a framework which specifies quality standards, practices, resources, and the sequence of activities The quality plan should define:[1] Objectives to be achieved A workflow that represents
Status
Identifier indicating the characteristic of an element of information for which at all times a value can be established. Word status has been included in ISO 19650 Framework meant to
Value
What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
delta exchange
exchange of only changed information between two synonymous sources PAS 14191:2020
Project Information Standards
Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards In line with BIM Goals and Uses to ensure continuity that information containers are structured, coordinated, managed
Capital delivery phase
Delivery phase [ISO1950] Delivery phase is a simplification of capital/delivery phase without making any assumption about how the project funding is being treated in financial accounting

PAS 1192 vs ISO 19650 terms
Quick reference guide In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison. PAS references (superseded) ISO References (current) Pre-contract BEP Pre-appointment BEP Post-contract
End Event (Message)
At the end of the process, this type of end indicates that a message is sent to a participant.[1] Symbol N Method and Style: A levels-based methodology for BPM process
Model Production Delivery Table (MPDT)
An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail. The recent publication of ISO 19650 standards does not include
purposeful
having a definite objective and strong desire to achieve it In the context of BIM, it describes a people-centric transformation, regarding information as an asset
Thermal insulation rating factor (Ci)
Ci Rating factor used for calculating theminimum required cable size for cables run in thermal insulation. See BS7671:2018 Table52.2.

Arc Fault Detection Devices (AFDDs)
Arc Fault Detection Devices (AFDDs) in the UK: Technical Requirements and Implementation Executive Summary Arc Fault Detection Devices (AFDDs) represent a significant advancement in electrical fire safety. This whitepaper provides
Construction Manager at Risk
Various key characteristics of CM@Risk include: there are separate contracts for design services and for construction services; the contract for construction services may be entered into at the same time
The Gemini Principles
Purpose: Must have clear purpose Public good Must be used to deliver genuine public benefit in perpetuity Value creation Must enable value creation and performance improvement Insight Must provide determinable
Z2
Z2 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the circuit protective conductor (cpc) of the circuit under consideration.
Harmonic
The presence of harmonic content in the line conductors of a three-phase and neutral circuit can give rise to excessive levels of load current in the neutral conductor.

Project Team
All parties appointed for the project are defined as members of the Project Team. Each function can be fulfilled by either an individual or multiple people throughout the course of
Infrastructure
the structures that emphasize, organise and enable social functions. Individual units of infrastructure are known as assets. It is sometimes subcategorised into economic infrastructure, the networks of built assets that
Product Data Definition
A Product Data Definition (PDD) document intended to provide a consistent methodology for the definition, creation, management and sharing of product information throughout the life cycle of an asset, based

The Level of and Progression Management systems
The ISO 19650 set of standards introduces a new term: ‘Level of information need’ which is designed to replace the terms used in BS EN 1192 such as Level of
major change
change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020
Clash Detection
Clash detection, coordination analysis and data checks shall be carried out by the BIM Coordinators against the latest shared models. The workflows involve a combination of visual and automated checks
Digital Construction
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
ontology
An ontology is a set of rules that make it possible to link data on a semantic level. Means the unstructured, semi-structured data can be read and encoded by computers.
data template
schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with the term “data template”. E.g.
Last Planner System®
The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of
fragmentation request
A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.
National Annex (NA)
With reference to BS EN ISO 19650 Framework, the working group could not conclude on international codification and standardised conventions. Hence Paul Shillcock and David Churcher, the lead authors, came
Look Ahead Plan
A short interval plan, based on the pull/phase plan, that identifies all the activities to be performed in the next 6 (or other) weeks. The 6W Look-Ahead Schedule (LAS) is
BS EN ISO 12006-2:2020
Building construction – Organization of information about construction works Part 2: Framework for classification
Federated Information Model
Computer science and IT In the fields of computer science and information technology, a federated information model refers to a structure where data is stored across multiple independent systems but can
Responsibility matrix
a chart that describes the participation by various functions in completing tasks or deliverables [cited from ISO 19650-1:2018(en), 3.1.1] Responsibility matrix shall be developed to cover information management activities and
Set-Based Design
Set-Based Design commonly referred to as a set-based design innovation or set-based concurrent engineering. It is a product development approach where teams consider a wide range of design alternatives (a
enumerated type value
data type consisting of a set of named values called elements, members, enumeral, or enumerators ofthe type
blockchain
The blockchain is a transaction database shared by all nodes involved in the system based on the Bitcoin protocol. It is a data structure consisting of linked blocks (e.g. confirmed
Cyber-Physical Systems
Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a Cyber-Physical System is a Digital
model validation checklist
The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes. Table 1 – Model Validation Checklist Check Definition Project
expert
person who, through knowledge or experience, has competence to give an opinion in the fields about which he/she is consulted[SOURCE: ISO 13302:2003, 3.10, modified — The domain “” has been
Security Management Plan
A document (or part of a document) identified in the Information Particulars setting out the security requirements for carrying out the Works in a security-minded way, including any policies, protocols,
Level of model definition
The PAS1192 term is replaced by ‘Level of information need’ an ISO19650 term Level of information need is a more generic term than any of the existing “Level of …”
actor
person, organization or organizational unit involved in a construction process [cited from ISO 19650-1:2018(en), 3.2.1]
AD Hoc Group (AHG)
AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting. The group is disbanded after
BIM Strategic Lead
Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM staff duties include: Development of
Assignment matrix
Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192] The former is illustrated as
graphical
The PAS1192 term has been replaced by ISO19650 term ‘geometrical’ Geometrical is more appropriate to describe spatial positioning and relationships
Team’s Capability and Capacity
The competence and understanding of BIM, of the consultants and delivery team partners to be involved in the project, shall be assessed and results included in Post-Contract BEP. The assessment
Master Schedule
The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first