The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
asset management
coordinated activity of an organization to realize value from assets Note 1 to entry: Realization of value will normally involve a balancing of costs, risks, opportunities and performance benefits.Note 2
Building Research Establishment Environmental Assessment Method (BREEAM)
It is a UK green building certification system, launched in 1990 by the Building Research Establishment (BRE), similar to LEED. Both systems confirm the level of the sustainability performance of
Workset
A workset is a collection of elements in a work shared Revit project. The purpose of worksets is to enable multiple users to work on the same project and facilitate
Information Controller
Responsible for setup and management of the Common Data Environment (CDE), document submission, RFI and other project document transactions. [Appointment: Lead Appointed Party Information Controller, site-based/office based.] [source] PDE 4301
Clash Detection
Clash detection, coordination analysis and data checks shall be carried out by the BIM Coordinators against the latest shared models. The workflows involve a combination of visual and automated checks
Intermediate Event (Link/Throwing) Gateway
A gateway is a device that controls the divergence and convergence of sequence flows in a process or choreography. As a result, it will determine path branching, forking, merging, and
Risk Register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
BS 9999:2017
Fire safety in the design, management and use of buildings – Code of practice
Industry Foundation Classes (IFC)
conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is a standardized, digital description of
Ze
That part of the earth fault loop impedance which is external to the circuit under consideration. For the supply cable it will be the impedance external to the installation. For
interaction framework schema
a formal description of the rules with which an interaction framework must comply[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
Subcommittee (SC)
a Subcommittee (SC), which addresses a specialized area within a TC; https://www.iso.org/glossary.html
Required Standard
means the level of skill and care applicable to the Party’s equivalent obligation under the Appointment. [1] [1] UK BIM Framework, 2020. Information protocol to support BS EN ISO 19650-2
Insurance Backed Alliancing
A new procurement method coupled up with Integrated Project Insurance model (IPI) is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence

Wiring in Protected Escape Route
Compliance with fire safety regulations in Firefighting Cores directly affects life safety and emergency response. This guide will help you meet the latest fire performance standards.

BIM and Lean Construction
Introduction The term referred to as Lean Construction aims to reduce overproduction, minimise handling, storage, transportation, or remove processes that do not add value. The Construction industry recognized the potential

digital construction campaign!
Thank you #willmottdixon team at our London Southbank University project for the #opportunity to participate in the #BIM & #digitalconstruction campaign! #LSBU #WDI, #WES, #team, #ConstructingPlainLanguage

Information Interoperability
Information overload What makes construction management so challenging is the sheer amount of information available, the volume of the data means that we are often not able to extract or
system
interacting objects organized to achieve one or more stated purpose [SOURCE: ISO/IEC/IEEE 15288:2015, 4.1.46, modified — The words “combination of” at the beginninghave been removed; “elements” has been replaced by
BS EN ISO 14004:2016
Environmental management systems General guidelines on implementation

Quality Control
Quality control indicates an operational activity within the process, while quality assurance focuses on constructing confidence that quality requirements will be met. Quality is incorporated into production and verified during
Employer
Appointing party ISO 19650 term depends on where in the hierarchy the employer is located.The BS EN ISO 19650‑2 appointing party (A) is the equivalent of the PAS 1192‑2:2013 top‑level
Project setup
During project setup phase It is essential to establish and analyse a timeline that guides the entire team in delivering the project on time. Thus the prospective Lead Appointed Party
Master Information Delivery Plan (MIDP)
The Master Information Delivery Plan (MIDP) is the primary plan for the preparation of project information (from the supplier’s perspective), which is set out as being required in the Exchange
BIM STRATEGY
a plan of action designed to achieve a long-term or overall aim. Definitions from Oxford Languages Required to define and understand what your company is trying to achieve with BIM.

Selectivity
Resolving Selectivity Issues in Electrical Design Free Trimble ProDesign Introduction Training Course Click the button below for more details: ProDesign Course Selectivity is achieved where,under overcurrent conditions, the protective device
racetrack
Information delivery cycle It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project and asset
knowledge model
information model that expresses knowledge in a computer interpretable structure Note 1 to entry: A knowledge model consists of a number of expressions of facts about a concept, each of which
Operations and Maintenance (O&M)
Describes the functions, duties, and labour associated with the operations of an asset, including repairs, replacement of parts and structural components, and other activities needed to maintain an asset.
Gateway (Parallel)
[And] When used to split the sequence flow, all outgoing branches are activated at the same time. When parallel branches are merged, it waits for all incoming branches to complete
attribute
Depending on the technology discussed, the term attribute can be treated as equivalent to a property or as a set of attributes, such as the number of elements in a
Appointment
Equivalent to PAS1192 term ‘Contract’ The more generic term appointment has been used in ISO 19650 instead of contract. This means one term can be used for both external contracts
Resources
In the context of project management, the resources refer to optimizing the use of resources for successful project execution and the management of resources in the project. [1] Therefore, the
Model Upload Workflow
3D models shall be synchronized with the central cloud model after daily work is done to ensure the rest of the project team are coordinating with the latest information. All
Parametric behaviour
The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object or the context in which
Asset Information Requirements (AIR)
Term introduced by ISO 19650 set of standards is related to information required during the operation phase of an asset AIR define managerial, commercial and technical aspects of information production,
International Harmonized Stage Codes
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF
computer-aided design (CAD)
Computer-aided design (CAD) encompasses the use of computers (hardware) and software to assist in the design process. CAD software is frequently used by different types of engineers and designers. CAD
Facility Data
The non-graphical information attached to objects in the Model that defines various characteristics of the object. Facility Data can include properties such as parametric values that drive physical sizes, material
Conformity Assessment Committee (CASCO)
Committee whose secretariat is provided by ISO/CS that deals with conformity assessment and is responsible for the development of conformity assessment standards. https://www.iso.org/glossary.html
Level of information (LOI)
The term used in relation to management of the progression and uses of information. There is general confusion with the use of the term, due to range of other interrelated
Ambient temperature
The temperature of the free air surrounding a cable,or in the case of cables installed in the ground, the temperature of the surrounding soil.For an enclosed method such as ‘In
Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for

LTF_Lighting-Fixture Circular
LTF_Lighting-Fixture_Luminaire-Circular vv22.1.1. Family For: Electrical Engineers, Bim Managers, Electrical Designers Setup: 10 – 30 minutes View Details Technical Details Released: Feb 9, 2025 Updated: Jul 5, 2025 Regional Variants: Uk
collaboration
a deliberate approach to working together on an agreed common purpose within functional, organisational, geographic, or organisational boundaries. Collaboration often depends on a solid knowledge management culture to facilitate the exchange and
Quality Assurance (QA)
Quality assurance (QA) is the action or process of verification that a requirement in terms of quality is being met. Managing the quality involves planning, establishing a workflow for fulfilling,

Organisational Purpose
A sense of organisational purpose is an essential part of promoting organisational effectiveness, which motivates individuals to do work and create something or justify the existence of something. Cooperation

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
Intermediate Event (Link/Catching)
Paired link events can also be used as “off-page connectors” in order to print a process across multiple pages. Within the process level, they can also be used as generic