Budget

The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must incorporate the total amount of financial resources needed for the project’s delivery and operation phase, not only the design and construction but also the maintenance and prospected repairs or asset. Project budget management aims to estimate and control project costs within the approved cost and achieve the project’s defined objectives.

During the design phase of the Office Extension, the team should consider the use of technology and materials taking  into account budget costs associated with capital expenditures (CAPEX) and long term operational expenditures (OPEX) [1]

[1]      M. Kojic, “Project cost management: everything you need to know ,” May 24, 2019. https://clockify.me/blog/business/project-cost-management/ (accessed Jan. 16, 2021).

CDE areas and states: slide 1 from the Project Design ELI5 BIM Basics explainer
Common Data Environment (CDE)
Jarek Wityk

CDE area

ELI5-S1: BIM Basics E5: CDE areas and states Area and

Read More »
Project Design ring luminaire Revit family, lighting fixture
Instructions
Jarek Wityk

LTF_Lighting-Fixture Ring

Create unlimited lighting variations with parametric control.
The PD_LTF_Lighting-Fixture_Luminaire-Ring Family is a powerful, fully parametric Revit family that allows users to create limitless lighting fixture configurations.

Read More »

share this page

Leave a Reply

Your email address will not be published. Required fields are marked *