Design-Bid-Build

A contract type

  • There is a sequential award of two separate contracts;
  • the first contract is for design services;
  • the second contract is for construction;
  • design and construction of the project are in sequential phases;
  • finance services, maintenance services and operations services are not included.1

1 The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.

Role

BIM roles are not necessarily related to specialist positions. It

Read More »

security

state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted,

Read More »

share this page

Leave a Reply

Your email address will not be published. Required fields are marked *