Committee

This could be:

a Technical Committee (TC), which develops standards in a certain sector or industry;

a Subcommittee (SC), which addresses a specialized area within a TC;

a Project Committee (PC), which is created to develop one standard, after which it is disbanded.

https://www.iso.org/glossary.html

Cross-sectional view of a residential building’s fire core, showing protected stairwells, lift shafts, fire-rated partitions, and service risers enclosed within fire-resistant construction, designed to maintain vertical compartmentation and safe evacuation routes during a fire.
How To
Jarek Wityk

Secondary Supply – diverse cable route

This guidance covers the routing of secondary supply cables from a life safety generator to the ATS (Automatic Transfer Switch), and the final equipment with reference to:

BS 7671:2018+A2:2022, specifically Section 560: Safety Services

BS 8519:2020, with emphasis on Clause 7 (Cable Routing) and Clause 11 (Cable Selection)

The goal: clarify requirements for the diverse cable routing and maintain circuit integrity under fire conditions for systems that support life safety and fire-fighting applications, such as sprinkler pumps, fire-fighting lifts, and smoke control systems.

Read More »

share this page

Leave a Reply

Your email address will not be published. Required fields are marked *