The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
Management of duplicates
The procedure to remove duplicate properties shall be carried out on the relevant attributes. The management of duplicates cannot be fully automated. BS EN ISO 23386:2020
United States Army Corps of Engineers (USACE)
The United States Army Corps of Engineers is an engineer formation of the United States Army that has three primary mission areas: engineer regiment, military construction, and civil works.
Internet of Things (IoT)
This phrase refers to networked infrastructures that interconnect physical objects and allow for the management of the data they generate. A typical example of IoT is a home energy monitor
information
reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]
Point of Adoption
a moment in time where an organisation’s readiness, change into organisational capability/maturity Macro-BIM adoption: Conceptual structures Bilal Succar Mohamad Kassem Tweet The Point of Adoption (PoA) is not to be
Enabling Tools
Tools that help design, develop, deliver, and maintain the built asset. You may require a number of different enabling tools for specific tasks and functions. https://www.thenbs.com/knowledge//periodic-table-of-bim
Subject to Simultaneous Overload
Where circuits are grouped, there are two availablemethods of calculating the rating factor Cg to be applied: [BS7671:2018,Appendix 4,5.1.2:Equation 2] [BS7671:2018,Appendix 4,5.1.2:Equation 3,4]

LTF_Lighting-Fixture Rectangular
LTF_Lighting Fixture_Generic Rectangular Light v22.1.3 Family For: Electrical Engineers, Bim Managers, Electrical Designers Setup: 10-30 minutes View Details Technical Details Released: Feb 2, 2025 Updated: Jul 5, 2025 Regional Variants:
Z1
Z1 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the line conductor of the circuit under consideration.

Appointed Party context of information exchange
ELI5-S2: BIM in Practice E6: Appointed Party context of information exchange Understanding the Appointed Party (T2-T4) Context of Information Exchange in BIM Welcome to the final instalment of our ELI5-S2
Tier 1
In the construction industry, Tier 1 is a Contractor referred in ISO 19650 as the Lead appointed party, who provide goods or services directly to the ultimate client. The Tier
Building Research Establishment Environmental Assessment Method (BREEAM)
It is a UK green building certification system, launched in 1990 by the Building Research Establishment (BRE), similar to LEED. Both systems confirm the level of the sustainability performance of
Intermediate Event (Link/Throwing) Gateway
A gateway is a device that controls the divergence and convergence of sequence flows in a process or choreography. As a result, it will determine path branching, forking, merging, and
BS EN ISO 19650-1:2018
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 1: Concepts and principles

The role of management in BIM implementation at a project and organisational level
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of dedicated BIM management role within

Project Template_RVT_2022
Revit Electrical Project Template 2022 v22.2.1 Template For: Electrical Engineers, Bim Managers, Electrical Designers Setup: Typically 2–4 hours — quicker for experienced users. View Details Technical Details Released: Apr 29,
information requirement
The information needed to support a business or other activity. specification for what, when, how and for whom information (3.3.1) is to be produced [cited from ISO 19650-1:2018(en), 3.3.2] Term directly related to:
UML diagram
provides the data structure for data templates using objects, collections and relationships between them. The multiplicities in the UML diagram specify the range of allowablecardinality values, giving a specification of
agent
…’An agent is just something that acts (agent comes from the Latin agree, to do). Of course, all computer programs do something, but computer agents are expected to do more:
4D Modeling
4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains possible, all project members must
Distribution board
An assembly containing protective devices associated with one or more outgoing circuits fed from an incoming circuit. In the ProDesign software,a distribution board (DB) may be single-phase or three-phase,and can
Ground rating factor (Cc)
The rating factor Cc = 0.9 is applied to cable sizing calculations for cables installed in the ground (Installation Methods 70 to 73). See BS7671:2018,Appendix 4,Sections3,4 and 5.1.1.
risk register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
Operations and Maintenance (O&M)
Describes the functions, duties, and labour associated with the operations of an asset, including repairs, replacement of parts and structural components, and other activities needed to maintain an asset.
ontology
An ontology is a set of rules that make it possible to link data on a semantic level. Means the unstructured, semi-structured data can be read and encoded by computers.
Pre-contract BEP
On projects where ISO 19650 Framework has implemented a term, Pre-appointment BEP is used instead of the PAS 1192 term Pre-contract BEP. The meaning is the same, it communicates on
Data Object
Data objects provide information about the activities that must be performed and/or the results that they produce. Elements of data objects must be contained within process or sub-process elements. Data
Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a
Open Data
The Open Data Institute (ODI) defines open data as information that is licensed for anyone to use for any purpose at no cost. Open data can be accessed, used and
Ambient temperature
The temperature of the free air surrounding a cable,or in the case of cables installed in the ground, the temperature of the surrounding soil.For an enclosed method such as ‘In
BS 8541-3:2012
Library objects for architecture, engineering and construction Part 3: Shape and measurement – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede BS 8541, parts 1-6.
Scope
Bid response should include a scope management plan containing all the tasks necessary for successful project delivery. The plan shall define the implementation and verification of workflows. A project should
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys
racetrack
Information delivery cycle It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project and asset
Association Française de Normalisation (AFNOR)
Association Française de Normalisation Asociation French Normalization Organization Regulation
BS EN 17412‑1:2020
Building Information Modelling — Level of Information NeedPart 1: Concepts and principles

Wiring in Protected Escape Route
Compliance with fire safety regulations in Firefighting Cores directly affects life safety and emergency response. This guide will help you meet the latest fire performance standards.
The Gemini Principles
Purpose: Must have clear purpose Public good Must be used to deliver genuine public benefit in perpetuity Value creation Must enable value creation and performance improvement Insight Must provide determinable
Residual Current Device (RCD)
AResidual Current Device (RCD) is amechanical switching device or association of devices intended to cause the opening of the contacts when the residual current* attains a given value under specified
Distributed Ledger Technology
Distributed Ledger Technology (DLT) is an encrypted and distributed database that serves as a register for storing records of transactions. At the core of DLT is a data model that
promotor
algorithm that generates an interaction schema from an interaction framework, interaction framework schema, and templates file as input [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed
Last Planner System®
The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of
breakdown structure
decomposition of a defined scope into progressively more detailed levels

MEP Abbreviations, Symbols & Acronyms
MEP Abbreviations, Symbols & Acronyms Reference This table contains electrically biased commonly used MEP abbreviations and acronyms, covering everything from current ratings and protection devices to power systems and components.It’s

Domestic PV sizing rule-of-thumb (RoT)
Domestic PV sizing rule-of-thumb (RoT) Grid-tied, focused on self-consumption UK rule-of-thumb (RoT) Peak Sun Hours (PSH): 3.5 summer, 2.0 spring/autumn, 1.0 winter For calc use Peak Sun Hours (PSH) =
suitability
degree to which a product, system or information provides functions that meet stated and implied needs when used under specified conditions [cited from: ISO/IEC 25010:2011(en), 4.2.1, added word ‘information’] appropriateness
Cost Led Procurement
A procurement method introduced by Constructing Excellence and the Cabinet Office intended to allow industry to use its experience and knowledge to develop innovative solutions through leveraging design, materials, subcontracting, direct labour

Selectivity
Resolving Selectivity Issues in Electrical Design Free Trimble ProDesign Introduction Training Course Click the button below for more details: ProDesign Course Selectivity is achieved where,under overcurrent conditions, the protective device
Asset Information Model (AIM)
The Asset Information Model or AIM is a term used to define the set of information gathered from all sources that support the continuing management of an asset

Comparison of status codes between UK National Annex (NA) 2018 vs UK NA 2021
# BS EN ISO 19650-2 2018 BS EN ISO 19650-2 2018, NA 02/2021 # Status Code Suitability Action by Suitability Action by Information State (at any project stage): Work in