How to respond to request for proposal (RFP)
Introduction It can be said that the digitalization of construction began with designers moving from drawing boards to computers. [1] In Architecture, Engineering, Construction and Operation (ACEO), the focus has
energy let-through of a device (I2t)
I2t The energy let-through of a device in A2s. The total amount of energy let through by a protective device for a given level of fault current at a stated
Role
BIM roles are not necessarily related to specialist positions. It should be viewed as a function that could be fulfilled by more than one person and allow the transfer of
breakdown structure
decomposition of a defined scope into progressively more detailed levels
Sub-process
A sub-process is a group of activities that are performed as part of a larger process or choreography. It is compound in the sense that it can be broken down

Comparison of status codes between UK National Annex (NA) 2018 vs UK NA 2021
# BS EN ISO 19650-2 2018 BS EN ISO 19650-2 2018, NA 02/2021 # Status Code Suitability Action by Suitability Action by Information State (at any project stage): Work in
Set-Based Design
Set-Based Design commonly referred to as a set-based design innovation or set-based concurrent engineering. It is a product development approach where teams consider a wide range of design alternatives (a
Strategic Objectives of BEP
Objectives of BEP shall be allignwed with Exchange Information Requirements (EIR), an example of Strategic Objectives for a project have been listed below: Meet Level 2 BIM compliance, in accordance

BIM Levels
The transition from the BIM Levels to the concepts in the ISO 19650 series and the UK BIM Framework represents a shift in how we think about BIM maturity. However,

Function
ELI5-S1 BIM Basics E17_BIM Functions Understanding Functions: A Basic Guide In both everyday life and specialised fields like mathematics, computer science, and even construction, the term “function” is widely used.
Industry 4.0
Industry 4.0 is more than just manufacturing. Smart, connected technologies transform how we design, manufacture, use and maintain parts, products, and entire buildings. The interconnected technology also changes the way
Specialist BIM Manager / Coordinator
The Specialist BIM Coordinator duties will reflect those for the Project BIM Coordinator but will be specific for discipline or trade-specific models and data deliverables. Responsible for checking, reviewing and
BS 9999:2017
Fire safety in the design, management and use of buildings – Code of practice
verification
confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service meets the specification, it will
Appointing party
Appointing party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Employer’ ISO 19650 term depends on where in the hierarchy the employer is

federation strategy
ELI5-S1: BIM Basics E4: Federation Strategy Explained The purpose of the federation strategy and the Information Container (model) breakdown structure is to help plan the production of information by separate
BIM STRATEGY
a plan of action designed to achieve a long-term or overall aim. Definitions from Oxford Languages Required to define and understand what your company is trying to achieve with BIM.
Open Data
The Open Data Institute (ODI) defines open data as information that is licensed for anyone to use for any purpose at no cost. Open data can be accessed, used and
domain
area of activity covering a science, a technique, a material, etc.Note 1 to entry: A domain can be associated with a group to which the property […] applies. BS EN
Project Committee (PC)
a Project Committee (PC), which is created to develop one standard, after which it is disbanded. https://www.iso.org/glossary.html
Semantic Web
The Semantic Web, as defined by Ontotext[1] is the extension of the existing information and data on a network (or Web) to include data descriptors, which are intended to allow
Computer aided facility management (CAFM)
Originally coined in the 60s, The acronym has become a catch-all for a wide range of Facilities Management platforms and software. A CAFM system can be broadly defined as a collaborative,
Fabrication Model
Digital Model(s) created from shop drawings to support fabrication and installation. Fabrication models are reviewed and approved by the A/E for conformance to design specifications.1 1 The Massachusetts Port Authority,
Conditions of Satisfaction
An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel that he or she received
BIM Use
A Use Case is a description of an intended use of the BIM, along with a description of the type(s) of data that must be in the BIM in order

COBie data drop
COBie data drop Individual COBie data drops are the responsibility of Task Team BIM Managers, who must upload the required information containers in accordance with Exchange Information Requirements (EIR).The COBie
Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for
Insurance Backed Alliancing
A new procurement method coupled up with Integrated Project Insurance model (IPI) is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence
Delivery team
In ISO 19650 the Delivery team term replaces the term ‘ Project Delivery team’ the meaning meant to remain the same, but the change puts the client (Appointing Party) outside

BS EN ISO 19650-2 UK National Annex (NA) 2021 status and use reference table
Status Code Used For Action by Information State (at any project stage): Work in progress (WIP) S0 Information developed within a task team [C], [B]* Information State (at any project

The future of BIM Managers in the AEC Industry
The future of BIM Manager The ‘BIM Manager’ role is discussed here in broad terms of management, not confined into a specific BIM role.[1] The function of BIM Manager already
End Event
An end event denotes the point at which a process’s path will come to an end. End events can only result in a “throw” of a result.[1] Symbol 1] Silver,

information delivery milestone
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery milestone is a point in

Organizational Drivers
The Organizational Driver is a term used to describe the initial component in the information exchange sequence. It represents the steps and actions involved in initiating the exchange process.

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The

Operational Team Context of Information Exchange
ELI5-S2: BIM in Practice E2: Operational Team Context of Information Exchange Explained In any BIM project, understanding the context of information exchange during the operational phase is crucial. This post
merge request
A merge request corresponds to the creation of one property and the deactivation of several properties. After validation of the merge request by the experts, the merged properties are deactivated.
Value Stream Mapping
A diagram of every step involved in the material and information flows needed to bring a product from request to delivery. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines
BS 8541-1:2012
Library objects for architecture, engineering and constructionPart 1: Identification and classification – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede BS 8541, parts 1-6.
Work standards and workflows
Project management focuses on project completion by the execution of various processes. Most of the workflows comprising repetitive tasks can be optimised by applying workflow management systems. Automation-optimized business processes
Architecture, Engineering and Construction (AEC) integration with Industry 4.0
The meaning of the term Industry 4.0 has not been concluded. There is a level of ambiguity of what it means for the construction industry[1] According to Jim Mansfield,

Emergency Lighting Standards and Regulations
BS 5266‑1:2025 – whats changed? Status & scope. The new edition was published on 29th and came into effect on 31 October 2025, withdrawing BS 5266-1:2016. It is intended to be
Waste
The opposite of value. There are eight basic types of waste: motion waiting transportation of goods over-processing under utilization overproduction inventory defects [1] [1] The Massachusetts Port Authority, 2015. BIM
Model Upload Workflow
3D models shall be synchronized with the central cloud model after daily work is done to ensure the rest of the project team are coordinating with the latest information. All
Circuit protective device (CPD)
A fuse or circuit-breaker providing overload and fault current protection.
Integrated Project Insurance (IPI)
The integrated Project Insurance model (IPI) coupled up with Insurance Backed Alliancing is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence
taxonomy
A system for naming and organizing a set of words or phrases, into groups that share similar qualities, used for organising information and primarily intended for browsing. In BIM contexts