Organizational Information Requirements (OIR)

ELI5-S1: BIM Basics E7: OIR explained

information requirements in relation to organizational objectives

BS EN ISO 19650โ€‘1:2018 (3.3.3)

pre-design process

construction processย (3.3.2)ย determiningย construction propertiesย (3.5.1)ย for theย built environmentย (3.1.7)ย before it is designed[1] 1 Online

Read More ยป
How To
Jarek Wityk

Electric Vehicle Charging Points

Active charging points are fully wired and connected, ready-to-use charging points.
A passive charging point, on the other hand, is the infrastructure without the final charging unit installed.

Read More ยป

share this page

Leave a Reply

Your email address will not be published. Required fields are marked *